Study on Longitudinal Constraint System of Nizhou Waterway Bridge of Second Humen Bridge

被引:0
|
作者
Zhang, Xin-Min [1 ]
Xu, Yuan-Qing [2 ]
Lu, Li-Tao [1 ]
Li, Chong [2 ]
机构
[1] The 2nd Humen Bridge Branch, Guangdong Highway Construction Co., Ltd., Guangzhou,511400, China
[2] CCCC Highway Bridges National Engineering Research Centre Co., Ltd., Beijing,100088, China
关键词
10;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:7 / 12
相关论文
共 50 条
  • [1] Hoisting and Installation Construction Technology for Main Cable Saddle of Nizhou Waterway Bridge of Second Humen Bridge
    虎门二桥坭洲水道桥主索鞍吊装施工技术
    2018, Wuhan Bridge Research Institute (48)
  • [2] Construction monitoring techniques for foundation pit of west anchorage of Nizhou waterway bridge of second Humen Birdge
    Zhu, Zhi-Bao (248941928@qq.com), 1600, Wuhan Bridge Research Institute (46):
  • [3] Anchorage Blocks of the Second Humen Bridge
    Yong, Yuan
    Wu Yugang
    Xu Guoping
    Gan, Ya
    HIGH TECH CONCRETE: WHERE TECHNOLOGY AND ENGINEERING MEET, 2018, : 2654 - 2659
  • [4] Design and construction of the Second Humen Bridge, China
    Wang, Xiaoming
    Fei, Pengbo
    Zhang, Xinmin
    Dong, You
    Melchy, Okandze Danny
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-CIVIL ENGINEERING, 2019, 172 (04) : 161 - 166
  • [5] Study on Humen Bridge superstructure construction supervision and control
    Zhang, J.
    He, Y.
    Dai, Z.
    Gongku Jiaotong Keji/Journal of Highway and Transportation Research and Development, 2001, 18 (02): : 19 - 23
  • [6] Longitudinal constraint system optimization for three-tower suspension bridge
    Liang, Peng
    Wu, Xiang-Nan
    Li, Wan-Heng
    Xu, Yue
    Zhongguo Gonglu Xuebao/China Journal of Highway and Transport, 2011, 24 (01): : 59 - 67
  • [7] Study on the vibration reduction of the stayed-cable on the northern waterway bridge of Hangzhou Bay bridge
    Wang, Zhongwen
    Zhu, Hongping
    Fang, Qinhan
    Gu, Jinjun
    Chen, Rufa
    Zhongguo Tiedao Kexue/China Railway Science, 2010, 31 (02): : 45 - 49
  • [8] The Longitudinal Study: A Bridge to the Future
    McDermott, John F.
    JOURNAL OF THE AMERICAN ACADEMY OF CHILD AND ADOLESCENT PSYCHIATRY, 2011, 50 (04): : 317 - 319
  • [9] Study On Navigation Technology Of Waterway At Hub Downstream And Bridge Area Overlapping
    Liu, Xin
    ADVANCES IN CIVIL AND INDUSTRIAL ENGINEERING IV, 2014, 580-583 : 1883 - 1887
  • [10] A constraint-based system for arranging bridge spans
    Lee, JS
    Yau, NJ
    JOURNAL OF THE CHINESE INSTITUTE OF ENGINEERS, 2002, 25 (06) : 693 - 706