Approaching paths of helicopter live-line work platform to 500 kV UHV AC transmission lines for different conductor arrangements

被引:0
|
作者
Liu C. [1 ]
Ruan J. [1 ]
Du Z. [1 ]
Liao C. [1 ]
Long M. [1 ]
机构
[1] School of Electrical Engineering, Wuhan University, Wuhan
关键词
Approaching path; Electric field intensity; Helicopter live-line work; Models; Platform method; UHV AC power transmission; UHV power transmission;
D O I
10.16081/j.issn.1006-6047.2017.01.024
中图分类号
学科分类号
摘要
An approaching path model of HLLWP(Helicopter Live-Line Work Platform) to 500 kV UHV AC transmission lines is established based on the actual parameters of helicopter and conductor arrangements of transmission lines. The finite element method is adopted to calculate the electric field intensities of HLLWP and worker's screening clothing for different approaching angles of HLLWP and different distances between HLLWP and conductor, based on which, the optimal approaching paths of HLLWP to different phase-conductors are given for different conductor arrangements. © 2017, Electric Power Automation Equipment Press. All right reserved.
引用
收藏
页码:151 / 156
页数:5
相关论文
共 18 条
  • [1] Shu Y., Hu Y., Maintenance and live working technology for ultra high voltage transmission line, High Voltage Engineering, 33, 6, pp. 1-4, (2007)
  • [2] Hu Y., Research and development of live working technology on transmission and distribution lines, High Voltage Engineering, 32, 11, pp. 1-10, (2006)
  • [3] Li G., Present situation and development of helicopter power job in China, Electric Power Construction, 7, 3, pp. 41-45, (2006)
  • [4] Shang D., Present situation and development of power job with helicopter in North China Power Grid, Electric Power Construction, 8, 4, pp. 33-35, (2007)
  • [5] Wang J., Shen J., Chen F., Et al., Live EHV transmission line insulator flush using helicopter, Electric Power Construction, 28, 7, pp. 36-39, (2007)
  • [6] Li Y., Li J., Comparison research of working methods and platforms in helicopter live line maintenance, Central China Electric Power, 24, 3, pp. 20-24, (2011)
  • [7] Li Y., Li J., Status quo, technical difficulties and development tendency of helicopter live-line maintenance, Central China Electric Power, 24, 1, pp. 18-22, (2011)
  • [8] Yu D., Shen J., Wang J., Research and application of helicopter in patrol and hotline operating maintenance of power lines, Power System Technology, 33, 6, pp. 107-112, (2009)
  • [9] Zhang K., Li H., Wang W., Analysis of helicopter patrol application prospect in China's UHV grid, High Voltage Engineering, 32, 6, pp. 45-46, (2006)
  • [10] Xiao Q., Deng H., Zhao W., Helicopter live-line work to 500 kV transmission lines in high altitude region, Yunnan Electric Power, 40, 2, pp. 50-51, (2012)