Ultradeep drilling pushes drillstring technology innovations

被引:0
作者
Jellison, Michael J. [1 ]
Chandler, R. Brett [1 ]
Payne, Mike L. [2 ]
Shepard, Jeff S. [3 ]
机构
[1] Grant Prideco
[2] BP America
[3] Transocean
关键词
D O I
10.2118/104827-pa
中图分类号
学科分类号
摘要
Drilling ultradeep (UD) wells places significant requirements on the drillstring. Lengthy drillstrings lead to high tensile loads, which can lead to slip crushing of the drillstring; hoisting capacity issues; and drillpipe collapse capacity concerns at the blowout preventer (BOP). BOP shear rams may also have difficulty shearing today's high-strength, high-toughness drillpipe. Bottomhole assembly (BHA) connection failures pose greater risk and cost at UD well depths. This paper analyzes the many challenges associated with drill-string designs specifically for UD drilling (UDD). It presents emerging drillstring technologies that are solutions expected to increase depth capability for the industry's continued advancement of deep-drilling operations. _Copyright © 2008 Society of Petroleum Engineers.
引用
收藏
页码:190 / 200
页数:10
相关论文
共 9 条
[1]  
Discoverer, Spirit Sets Deep Drilling Records, Rigzone News, (2005)
[2]  
ISO/CD 10407-1 2004. Petroleum and natural gas industries - Drilling and production equipment - Part 1: Drill stem design and operating limits
[3]  
Jellison M.J., Payne M.L., New drillpipe size improves ERD and deepwater drilling, World Oil, pp. 113-120, (2000)
[4]  
Levett B., The Effects of Improved Drillpipe Properties on BOP Shearing Capabilities, IADC World Drilling Conference, (2003)
[5]  
Payne M.L., Duxbury J.K., Martin J.W., Drillstring Design Options for Extended-Reach Drilling Operations, ASME Energy-Sources Technology Conference and Exhibition, (1995)
[6]  
Smith J., Et al., Titanium Pipe Proving Ideal for Short Radius Drilling, American Oil & Gas Reporter, (2000)
[7]  
Drilling & Production Outlook, (2006)
[8]  
Spiri W.H., Reinhold W.B., Why does drillpipe fail in the slip area? World Oil, (1959)
[9]  
Webbolt Newsroom, (2006)