Engineering considerations for large dam removals

被引:2
作者
Hepler, Thomas E. [1 ]
机构
[1] U.S. Bureau of Reclamation, Denver Federal Center, Denver, CO 80225-0007
来源
Hepler, T.E. | 1600年 / Geological Society of America卷 / 21期
关键词
7;
D O I
10.1130/2013.4121(02)
中图分类号
学科分类号
摘要
The removal of a large dam requires special engineering considerations not normally required for the removal of smaller dams. Large dams generally provide greater project benefits, but they represent a higher downstream hazard in the event of failure and greater challenges to fish passage. The reservoirs associated with large dams can impound more sediment and affect downstream water quality to a greater degree. The environmental compliance and decision-making process for a large dam removal project can take many years and will normally require the evaluation of a full range of project alternatives with estimated costs, the performance of a comprehensive environmental impact analysis, and the identification and implementation of extensive mitigation measures. Streamflow diversion and demolition plans for the removal of a large dam must ensure acceptable construction risks from start to finish, and produce reservoir drawdown at a controlled rate for sediment management purposes and to prevent instability of natural or embankment slopes. Large dams require more time for removal, at a higher cost, and contain greater volumes of materials for which disposal sites must be found. © 2013 Geological Society of America. All rights reserved.
引用
收藏
页码:11 / 24
页数:13
相关论文
共 7 条
  • [1] Guidelines for Retirement of Dams and Hydroelectric Facilities, (1997)
  • [2] Dam Removal-A New Option for A New Century, (2002)
  • [3] Final Environmental Impact Statement for Relicensing of the Klamath Hydroelectric Project No 2082-027, (2007)
  • [4] Hepler T.E., Large dam removals for restoration of the Elwha River, Proceedings, Dam Safety, Seattle, Washington, 19-23 September 2010, pp. 1-15, (2010)
  • [5] Hepler T., Greimann B., Chapman T., Szytel J., Remove or reinforce: Design alternatives to meet dam safety and fish passage requirements at San Clemente Dam, Proceedings of the 21st Century Dam Design-Advances and Adaptations, 31st Annual U.S. Society on Dams Conference, pp. 779-794, (2011)
  • [6] Pohl M.M., Bringing down our dams: Trends in American dam removal rationales, Journal of the American Water Resources Association, 38, 6, pp. 1511-1519, (2002)
  • [7] Detailed Plan for Dam Removal-Klamath River Dams, (2012)