Simulation of bridge steel structure construction process based on BIM technology

被引:0
|
作者
Pan W. [1 ]
机构
[1] SHEC STRCTURAL ENGINEERING LTD., Hubei, Wuhan
关键词
BIM technology; Construction simulation; Edge folding algorithm; Folding cost function; Quadratic error metric;
D O I
10.2478/amns-2024-1176
中图分类号
学科分类号
摘要
With the rapid development of computer technology and information technology, bridge engineering is gradually transformed into information technology, and bridge BIM design technology is increasingly concern by the industry. This paper uses BIM technology to simulate the construction process of bridge steel structures. In order to solve the problem that the first model of BIM is too complicated, this paper utilizes the edge folding algorithm and quadratic error metric to refold the model and establish the new vertex coordinates, and at the same time, introduces the folding cost function to maintain the model characteristics. In the simulation experiments of the bridge structure construction, stress changes of the main girder of the bridge body are analyzed in various merging states. When the fitting error is +15mm, +25mm, and +35mm, the stress on the upper edge of the main girder near the top of the pier increases by 0.24MPa, 0.52MPa, and 0.78MPa, respectively, for the selection of materials and the prediction of construction and assembly parameters, in which the length of the steel girder N1 is accurate to the millimeters, which is 39940mm, and the single piece weighs 9,532.5kg. To prevent collision and interference with the bridge pier, the crane should be raised at a height of not less than 6.6m during the lifting stage. It can be seen that BIM technology can not only simulate and predict non-geometric factors such as the materials used but also simulate the margin of error and the bridge stresses as a way to help bridge projects on the ground. © 2024 Wenming Pan, published by Sciendo.
引用
收藏
相关论文
共 50 条
  • [41] The application and exploration of the foundation construction management in high-rise building based on BIM technology
    Lin, Li
    Li, Jin
    Huang, Minyuan
    Sun, Yunhui
    Song, Xiqing
    2016 INTERNATIONAL CONFERENCE ON SMART CITY AND SYSTEMS ENGINEERING (ICSCSE), 2016, : 304 - 307
  • [42] Use of BIM technology and impact on productivity in construction project management
    Peter Mesároš
    Tomáš Mandičák
    Annamária Behúnová
    Wireless Networks, 2022, 28 : 855 - 862
  • [43] Use of BIM technology and impact on productivity in construction project management
    Mesaros, Peter
    Mandicak, Tomas
    Behunova, Annamaria
    WIRELESS NETWORKS, 2022, 28 (02) : 855 - 862
  • [44] The Application of BIM Technology in Budget Control of Port Construction Cost
    Li, Ying
    Li, Qian
    JOURNAL OF COASTAL RESEARCH, 2020, : 644 - 648
  • [45] Research on Application of BIM Technology in Construction Project Cost Management
    Mo, Lianguang
    2018 3RD INTERNATIONAL CONFERENCE ON SMART CITY AND SYSTEMS ENGINEERING (ICSCSE), 2018, : 208 - 210
  • [46] BIM Simulation Method for Construction Development About the Deep Excavation
    Tan Xianliang
    Guan Changsheng
    Gong Shusong
    Lu Yiwei
    He Xianwen
    INTERNATIONAL CONFERENCE ON SOCIAL SCIENCE, MANAGEMENT AND ECONOMICS (SSME 2015), 2015, : 886 - 890
  • [47] The Application Research on BIM Technology in Road and Bridge Projects in the Western Yunnan Area
    Huang, Yangbin
    Wang, Shenglan
    Zhao, Jie
    AGRO FOOD INDUSTRY HI-TECH, 2017, 28 (01): : 2964 - 2967
  • [48] BIM technology Used in underground subway station planning simulation
    Pu, Hongke
    Wei, Qingchao
    ADVANCES IN CIVIL AND INDUSTRIAL ENGINEERING IV, 2014, 580-583 : 1174 - 1177
  • [49] Construction of water supply and drainage fire water system of construction project under BIM technology
    Chen X.
    Applied Mathematics and Nonlinear Sciences, 2024, 9 (01)
  • [50] Research on Comprehensive Budget Management of Construction Enterprises Supported by BIM Technology
    Chai, Xinwei
    Feng, Dongmei
    2014 INTERNATIONAL CONFERENCE ON ECONOMICS AND MANAGEMENT, 2014, : 385 - 389