Process engineering for Fuzhou steam power plant in China

被引:0
作者
Henselak, W. [1 ]
Lochmiller, R. [1 ]
机构
[1] Siemens AG, Power Generation, Erlangen, Germany
来源
VGB PowerTech | 2001年 / 81卷 / 11期
关键词
Coal fired boilers - Feedwater pumps - Process engineering - Project management - Steam turbines - Strategic planning;
D O I
暂无
中图分类号
学科分类号
摘要
The aim of constructors of large steam power plants worldwide is to develop standardized concepts and to focus on low life-cycle costs when implementing these concepts for their customers. Specific customer requirements or on-going development of a power plant site impose certain limitations. In China, a power plant of the 350 MC class will typically feature a turbine building with heater bay, a drum-type boiler with steam parameters upstream of the turbine set at pMS = 166.7 bar; TMS and TReheat = 538 °C for full-load operation, and a two-cylinder steam turbine as customer and country-specific options.