共 14 条
[1]
Zhou X., Xue Q., Luo J., Risk identification and prevention measures for predrilling site selection in the Sichuan Basin, Natural Gas Industry, 32, 8, pp. 105-107, (2012)
[2]
Li G., Types and countermeasures of harmful factors in oil predrilling construction, Resources Environment & Engineering, 22, 4, pp. 454-456, (2008)
[3]
The Cost Department of PetroChina Southwest Oil and Gas Field Company, The Guidance for the Preliminary Work for Spudding Design, (2009)
[4]
The Cost Department of PetroChina Southwest Oil and Gas Field Company, The Detailed Rules for the Implementation of Reconnaissance, Design, (2007)
[5]
Wang Y., Construction engineering project budget reasons and measures, Petroleum Engineering Cost Management, 3, pp. 31-33, (2008)
[6]
Jiang H., The cost control method in oil predrilling construction, China Science and Technology Review, 27, pp. 524-524, (2012)
[7]
Detailed rules for the implementation of the project management in the exploration division of Southwest Oil and gas field company, (2014)
[8]
Chen Y., Cheng H., Shen X., Liu L., Building-up and practices of construction cost early-warning system of pre-drilling engineering design: A case study of PetroChina Southwest Company, Natural Gas Industry, 30, 8, pp. 101-104, (2010)
[9]
He J., Ye Y., Zhu Z., Xie H., Su B., Li H., Brief analyses of clean production technical measures in operation in Sichuan-Chongqing area, Environmental Protection of Oil & Gas Fields, 20, 1, pp. 45-48, (2010)
[10]
Liu X., He Z., He Z., Zhang J., He L., The production of oil drilling and completion of cleaning, Science & Technology Information, 14, pp. 247-248, (2008)