共 41 条
- [31] Application of the Process-computer System in the Combined Block at the Lausward Power Plant in West Germany. 1978, 77 (04): : 128 - 132
- [32] Methods of Production for Planning Systems for the Supply Network of the Hamburg Power System (HEW), in West Germany, with the Aid of an Interactive Graphical System. Elektrizitatswirtschaft, 1979, 78 (13): : 493 - 500
- [33] Failure Analysis and Overall Maintenance of Recirculation Cooling Water System Heat Exchanger of Third Qinshan Nuclear Power Plant Hedongli Gongcheng, 4 (112-115):
- [34] Investigation of the Waterwall System of the TGMP-240 800 MW Monoblock of the Zaporozhe State District Power Plant. Teploenergetika, 1979, (12): : 38 - 42
- [35] Off-Line Performance Calculating Software of the Secondary Loop Thermal System in AP1000 Nuclear Power Plant Lecture Notes in Electrical Engineering, 2020, 595 LNEE : 58 - 68
- [36] Optimal Load Distribution in the 110-kV railroad Power Supply Network of the West German Railroad System. eb - Elektrische Bahnen, 1979, 77 (09): : 258 - 262
- [37] Production-possibility Frontier-based Network Reconfiguration Strategy for Power System Integrated With Scaled Wind Farm Dianwang Jishu/Power System Technology, 2022, 46 (08): : 2986 - 2995
- [38] Mercury distribution in seawater discharged from a coal-fired power plant equipped with a seawater flue gas desulfurization system Environ. Sci. Pollut. Res., 8 (1324-1332):
- [40] Alarm information classification model of AVC system for district power network based on improved analytic hierarchy process and fuzzy synthetic evaluation Dianli Xitong Baohu yu Kongzhi/Power System Protection and Control, 2011, 39 (02): : 50 - 54