共 11 条
- [1] Mckay K.N., Buzacott J.A., Safayeni F.R., The scheduler's knowledge of uncertainty: The missing link, Proceedings of the IFIP Working Conference on Knowledge Based Production Management Systems, pp. 223-241, (1988)
- [2] Leon V.J., Wu S.D., Storer R.H., Robustness measures and robust scheduling for job shops, IIE Transactions, 26, 5, pp. 32-43, (1994)
- [3] Sevaux M., Sorensen K., A genetic algorithm for robust schedules in a one-machine environment with ready times and due dates, Quarterly Journal of the Belgian, French and Italian Operations Research Societies, 2, 2, pp. 129-147, (2004)
- [4] Mehta S.V., Uzsoy R., Predictable scheduling of a single machine subject to breakdowns, International Journal of Computer Integrating Manufacturing, 12, 1, pp. 15-38, (1999)
- [5] O'donovan R., Uzsoy R., Mckay K.N., Predictable scheduling of a single machine with breakdowns and sensitive jobs, International Journal of Production Research, 37, 18, pp. 4217-4233, (1999)
- [6] Goren S., Sabuncuoglu I., Robustness and stability measures for scheduling: Single-machine environment, IIE Transactions, 40, 1, pp. 66-83, (2008)
- [7] Davenport A.J., Gefflot C., Beck J.C., Slack-based techniques for robust schedules, Proceedings of the 6th European Conference on Planning, pp. 7-18, (2001)
- [8] Briskorn D., Leung J., Pinedo M., Robust scheduling on a single machine using time buffers, IIE Transactions, 43, 6, pp. 383-398, (2011)
- [9] Yin W., Liu M., Wu C., Learning single-machine robust scheduling heuristics subject to stochastic breakdowns using genetic programming, Journal of Tsinghua University: Science & Technology, 45, 1, pp. 81-84, (2005)
- [10] Liu L., Gu H., Xi Y., Robust scheduling in a just-in-time in a single machine system with processing time uncertainty, Control and Decision, 22, 10, (2007)