共 12 条
[1]
Newman A.M., Rubio E., Caro R., Et al., A review of operations research in mine planning, Interfaces, 40, 3, pp. 222-245, (2010)
[2]
Chen J.-Z., Optimization and regulation for stripping-ration of open-pits mines, (2001)
[3]
Yun Q.-X., A new method to balance open-pit mine stripping work, Nonferrous Metals(Mining Section), 4, pp. 15-18, (1984)
[4]
Zuo R., Optimization and regulation of open-pit stripping ratio, (2011)
[5]
Alarie S., Gamache M., Overview of solution strategies used in truck dispatching systems for open pit mines, International Journal of Surface Mining, Reclamation and Environment, 16, 1, pp. 59-76, (2002)
[6]
Ercelebi S.G., Bascetin A., Optimization of shovel-truck system for surface mining, Journal of the Southern African Institute of Mining and Metallurgy, 109, 7, pp. 433-439, (2009)
[7]
Celebi N., An equipment selection and cost analysis system for open-pit coal mines, International Journal of Surface Mining Reclamation and Environment, 12, 4, pp. 181-187, (1998)
[8]
Hartman J.C., Rogers J., Dynamic programming approaches for equipment replacement problems with continuous and discontinuous technological change, IMA Journal of Management Mathematics, 17, 2, pp. 26-30, (2006)
[9]
Rogers J.L., Hartman J.C., Equipment replacement under continuous and discontinuous technological change, IMA Journal of Management Mathematics, 16, 1, pp. 23-36, (2005)
[10]
Sevim H., Wang Q., De Tomi G., Economics of contracting overburden removal, Proceedings of the International Symposium APCOM, pp. 573-584, (1990)