Uncertainty of bivariate design flood estimation and its impact on reservoir flood prevention

被引:0
作者
Yin J. [1 ]
Guo S. [1 ]
Wu X. [1 ]
Liu Z. [1 ]
Xiong F. [1 ]
机构
[1] State Key Laboratory of Water Resources and Hydropower Engineering Science, Wuhan University, Wuhan
来源
Shuili Xuebao/Journal of Hydraulic Engineering | 2018年 / 49卷 / 06期
关键词
Bootstrap; C-PBU model; Copula function; Design flood; Reservoir operation; Uncertainty;
D O I
10.13243/j.cnki.slxb.20180038
中图分类号
学科分类号
摘要
The limited sample size would induce quantile estimation uncertainty in bivariate hydrological frequency analysis. A copula-based parametric bootstrap uncertainty (C-PBU) model considering the most likely realization to characterize the uncertainty of bivariate design flood estimation is proposed,and the quantitative uncertainty evaluation indexes are presented. The impacts of joint quantile estimation uncertainty on reservoir operation are explored and such uncertainty of highest reservoir water level derived from different typical flood hydrograph (TFH) schemes were compared. The 95% confidence regions of bivariate quantile estimation in the Geheyan reservoir are derived, and the influences of different sample sizes on uncertainty are investigated. The results demonstrate that the bivariate quantile estimation and TFH selection have large uncertainty. It is suggested to consider the uncertainty of reservoir flood prevention in practice by using of the C-PBU model. © 2018, China Water Power Press. All right reserved.
引用
收藏
页码:715 / 724
页数:9
相关论文
共 6 条
[1]  
Serinaldi F., An uncertain journey around the tails of multivariate hydrological distributions, Water Re-sources Research, 49, pp. 6527-6547, (2013)
[2]  
Duang N.V., Merz B., Bardossy A., Et al., Handing uncertainty in bivariate quantile estimation-An applica-tion to flood hazard analysis in the Mekong Delta, Journal of Hydrology, 527, pp. 704-717, (2015)
[3]  
Requena A.I., Mediero Orduna L., Garrote De Marcos L., A bivariate return period based on copulas for hydrologic dam design: accounting for reservoir routing in risk estimation, Hydrology and Earth System Sci-ences, 17, 8, pp. 3023-3038, (2013)
[4]  
Zhang Q., Xiao M., Singh V.P., Uncertainty evaluation of copula analysis of hydrological droughts in the East River basin, China, Global and Planetary Change, 129, pp. 1-9, (2015)
[5]  
Volpi E., Fiori A., Design event selection in bivariate hydrological frequency analysis, Hydrological Scienc-es Journal, 57, 8, pp. 1506-1515, (2012)
[6]  
Hyndman R.J., Bashtannyk D.M., Grunwald G.K., Estimating and visualizing conditional densities, J. Comput. Graph.Stat, 5, 4, pp. 315-336, (1996)