PTS control system based on CORBA

被引:0
作者
Tian, Qing [1 ]
Jiang, Ping [1 ]
Xie, Xingquan [2 ]
Zeng, Sifeng [2 ]
机构
[1] Key Laboratory of Pulsed Power, Institute of Fluid Physics, CAEP, P. O. Box 919-108, Mianyang
[2] Institute of Computer Application, CAEP, P. O. Box 919-1201, Mianyang
来源
Qiangjiguang Yu Lizishu/High Power Laser and Particle Beams | 2015年 / 27卷 / 04期
关键词
3-layer construction; Control system; CORBA; PTS; System integration;
D O I
10.11884/HPLPB201527.045003
中图分类号
学科分类号
摘要
The Z-pinch Primary Test Stand (PTS) which has been completed is composed of 24 modules, adopting capacitive storage scheme. It has a large number of control and monitoring nodes. For enhancing transplant and maintainability of server program and debasing exploitation difficulty of client, a control system based upon CORBA Controls Middle Ware is built to realize irrespective characteristic of platform and field of network communication. The application of CORBA technology and the control framework and the structure of PTS control system which has worked stably for one year are studied in this paper. It is a very important reference for building national high power laser equipment, X-ray free electron laser (XFEL) and designing large experimental physics control systems. ©, 2015, Editorial Office of High Power Laser and Particle Beams. All right reserved.
引用
收藏
页数:5
相关论文
共 12 条
  • [1] Feng S., Li H., Cao W., Et al., High voltage low jitter Marx generator of prototype module of primary test stand, High Power Laser and Particle Beams, 21, 1, pp. 152-156, (2009)
  • [2] Wei B., Qing Y., Feng S., Et al., Current measurement for a four-level magnetically-insulated transmission line, High Power Laser and Particle Beams, 26, (2014)
  • [3] Wei B., Qing Y., Wang M., Et al., Voltage and current measurement for multi-level vacuum insulator stack, High Power Laser and Particle Beams, 26, (2014)
  • [4] Liu X., High Pulsed Power Technology, (2005)
  • [5] Feng S., Li H., Xie W., Et al., Development of prototype module of Z-pinch primary test stand, High Power Laser and Particle Beams, 21, 3, pp. 463-467, (2009)
  • [6] Dang Z., Tang L., Zhang X., Et al., General technology research on high precision synchronizing system for large-scale laser facilities, High Power Laser and Particle Beams, 26, (2014)
  • [7] Werges S.C., David L.N., CORBA infrastructure for distributed learning and meta-learning, Knowledge-Based Systems, 15, pp. 139-144, (2002)
  • [8] Song Y., Liu Y., Dynamic reconfiguration for CORBA application, Computer Applications and Software, 22, 1, pp. 19-21, (2005)
  • [9] Zeng P., Tang X., Yang X., Et al., Design of Shenguang- Ⅱ facility centralized control system, High Power Laser and Particle Beams, 24, 11, pp. 2595-2598, (2012)
  • [10] Wang L., Zhang X., Tang L., Et al., Design of kJ pulse laser control system, High Power Laser and Particle Beams, 26, (2014)