共 93 条
- [1] WU Xiaojie, YU Yuesen, PENG Liming, Et al., present situation and prospect of electro - hydraulic control technology of hydraulic support[J], Coal Science and Technology, 37, 1, pp. 25-29, (2009)
- [2] WANG Guofa, REN Huaiwei, PANG Yihui, Et al., Research and engineering progress of intelligent coal mine technical system in early stages[J], Coal Science & Technology, 48, 7, pp. 1-27, (2020)
- [3] Shengsan HU, LIU Xiuyuan, CHENG Yuqi, The technical revolu? tion in the history of coal mining:the development of fully mecha? nized mining in China [J], Journal of China Coal Society, 35, 11, pp. 1769-1771, (2010)
- [4] TIAN Xiaoming, MA Zhenhu, Mining technology of 10 million tons fully mechanized coal face in Shangwan Coal Mine [J], Coal Engi? neering, 7, pp. 63-66, (2005)
- [5] Youjin GAO, Selection and design of hydraulic support with high reliability and large mining height of 6.2 m[ J], China Coal, 2, pp. 34-37, (2007)
- [6] Shoubin LI, Coal industry Internet and its key technologies[ J], Coal Science and Technology, 48, 7, pp. 98-108, (2020)
- [7] DERRICK K B, Qinghua LI, Recent development of working face automation in Britain [J], Coal Mine Automation, 3, pp. 45-52, (1981)
- [8] HONG Yan, Electro - hydraulic control system of YLT practical hydraulic support adjacent to support[ J], Tongmei Science and Technology, 2, (1998)
- [9] About LASC Longwall Automation
- [10] REID D, HENDERSON P, HAINSWORTH D, Et al., Intercon? nection of Landmark Compliant Longwall Mining Equipment - Shearer Communication and Functional Specification for Enhanced Horizon Control, (2005)