Critical path method-line of balance model for efficient scheduling of repetitive construction projects

被引:0
|
作者
Hegazy, Tarek [1 ]
机构
[1] Civil Engineering Department, University of Waterloo, Waterloo, Ont., N2L 3G1, Canada
关键词
D O I
10.3141/1761-16
中图分类号
学科分类号
摘要
引用
收藏
页码:124 / 129
相关论文
共 50 条
  • [41] Comparison of linear scheduling model (LSM) and critical path method (CPM)
    Yamín, RA
    Harmelink, DJ
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2001, 127 (05): : 374 - 381
  • [42] Scheduling of Repetitive Projects with Multiple Objectives by Multiple Crew Model
    Mathew, Jeeno
    Paul, Brijesh
    JOURNAL OF SCIENTIFIC & INDUSTRIAL RESEARCH, 2024, 83 (06): : 669 - 676
  • [43] Stochastic scheduling optimization of repetitive construction projects to minimize project duration and cost
    Hassan, Abbas
    El-Rayes, Khaled
    Attalla, Mohamed
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2023, 23 (09) : 1447 - 1456
  • [44] Object-oriented model for repetitive construction scheduling
    El-Rayes, K
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2001, 127 (03): : 199 - 205
  • [45] A TRADE-OFF BETWEEN TIME AND COST IN SCHEDULING REPETITIVE CONSTRUCTION PROJECTS
    Zhang, Lihui
    Zou, Xin
    Qi, Jianxun
    JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2015, 11 (04) : 1423 - 1434
  • [46] FACTORY CONSTRUCTION BY CRITICAL PATH METHOD
    ROBINSON, GA
    SUGAR JOURNAL, 1973, 35 (09): : 19 - 21
  • [47] Controlling Path and Controlling Segment Analysis in Repetitive Scheduling Method
    Zhang, Lihui
    Qi, Jianxun
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2012, 138 (11) : 1341 - 1345
  • [48] SCHEDULING WITH AN EXTENDED CRITICAL-PATH-METHOD
    MORLOCK, M
    ZEITSCHRIFT FUR ANGEWANDTE MATHEMATIK UND MECHANIK, 1980, 60 (7BIS): : T360 - T361
  • [49] A Bi-Objective Model for Scheduling Construction Projects Using Critical Chain Method and Interval-Valued Fuzzy Sets
    Dalouchei, Fatemeh
    Mousavi, Seyed Meysam
    Antucheviciene, Jurgita
    Minaei, Ahmad
    BUILDINGS, 2022, 12 (07)
  • [50] SCHEDULING PRODUCTION BY CRITICAL PATH METHOD AT MCINTYRE
    PARFITT, PO
    CANADIAN MINING AND METALLURGICAL BULLETIN, 1967, 60 (664): : 907 - &