Critical path method-line of balance model for efficient scheduling of repetitive construction projects

被引:0
|
作者
Hegazy, Tarek [1 ]
机构
[1] Civil Engineering Department, University of Waterloo, Waterloo, Ont., N2L 3G1, Canada
关键词
D O I
10.3141/1761-16
中图分类号
学科分类号
摘要
引用
收藏
页码:124 / 129
相关论文
共 50 条
  • [21] Scheduling programs with repetitive projects: An efficient approximation procedure
    Amor, JP
    DECISION SCIENCES INSTITUTE 1998 PROCEEDINGS, VOLS 1-3, 1998, : 1556 - 1556
  • [22] Fuzzy Dynamic Programming for Optimized Scheduling of Repetitive Construction Projects
    Bakry, I.
    Moselhi, O.
    Zayed, T.
    PROCEEDINGS OF THE 2013 JOINT IFSA WORLD CONGRESS AND NAFIPS ANNUAL MEETING (IFSA/NAFIPS), 2013, : 1172 - 1176
  • [23] Optimized scheduling and buffering of repetitive construction projects under uncertainty
    Bakry, Ibrahim
    Moselhi, Osama
    Zayed, Tarek
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2016, 23 (06) : 782 - 800
  • [24] Scheduling evaluation in construction projects using the critical chain project management method
    Sembiring, N.
    Putra, A.
    INTERNATIONAL CONFERENCE ON INNOVATION IN ENGINEERING AND VOCATIONAL EDUCATION 2019 (ICIEVE 2019), PTS 1-4, 2020, 830
  • [25] LOB and CPM Integrated Method for Scheduling Repetitive Projects
    Ammar, Mohammad A.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2013, 139 (01) : 44 - 50
  • [26] Fuzzy Repetitive Scheduling Method for Projects with Repeating Activities
    Maravas, Alexander
    Pantouvakis, John-Paris
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2011, 137 (07): : 561 - 564
  • [27] LINE-OF-BALANCE SCHEDULING IN PAVEMENT CONSTRUCTION
    ARDITI, D
    ALBULAK, MZ
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1986, 112 (03): : 411 - 424
  • [28] Efficient repetitive scheduling for high-rise construction
    Hegazy, Tarek
    Kamarah, Ehab
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2008, 134 (04): : 253 - 264
  • [29] Application of Linear Scheduling in Water Canal Construction with a Comparison of Critical Path Method
    Ramani, Prasanna Venkatesan
    Selvaraj, Ponnambalam
    Shanmugapriya, T.
    Gupta, Anshul
    JOURNAL OF CONSTRUCTION IN DEVELOPING COUNTRIES, 2022, 27 (01) : 189 - 212
  • [30] Non-unit-based planning and scheduling of repetitive construction projects
    Huang, Rong-Yau
    Sun, Kuo-Shun
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2006, 132 (06) : 585 - 597