The life cycle of production system shows the progress of production system from the inception to the termination of the system. During each stage, mainly in the design stage, certain strategic decisions have to be taken. These decisions are more complex as the decision makers have to assess a wide range of alternatives based on a set of conflicting criteria. As the decision making process is found to be unstructured, characterized by domain dependent knowledge, there is a need to apply an efficient multi-criteria decision making (MCDM) tool to help the decision makers in making correct decisions. This paper explores the application of a novel MCDM method i.e. Preference selection index (PSI) method to solve various decision-making problems that are generally encountered in the design stage of production system life cycle. To prove the potentiality, applicability and accuracy of PSI method in solving decision making problem during the design stage of production system life cycle, five examples are cited from the literature and are compared with the results obtained by the past researchers. © 2013
引用
收藏
页码:207 / 216
页数:9
相关论文
共 30 条
  • [1] Attri R., Grover S., A comparison of production system life cycle models, Front. Mech. Eng., 7, 3, pp. 305-311, (2012)
  • [2] Bellgran M., Safsten K., Production Development: Design and Operation of Production Systems, (2010)
  • [3] Bellgran M., Gullander P., Harlin U., (2002)
  • [4] Byun H.S., Lee K.S., A decision support system for the selection of a rapid prototyping process using the modified TOPSIS method, Int. J. Adv. Manuf. Technol., 26, pp. 1338-1347, (2004)
  • [5] Chakraborty S., Applications of the MOORA method for decision making in manufacturing environment, Int. J. Adv. Manuf. Technol., 54, pp. 1155-1166, (2011)
  • [6] Chakraborty S., Banik D., Design of a material handling equipment selection model using analytic hierarchy process, Int. J. Adv. Manuf. Technol., 28, pp. 1237-1245, (2006)
  • [7] Chase R.B., Aquilano N.J., Production and Operations Management: A Life Cycle Approach, (1977)
  • [8] Chatterjee P., Chakraborty S., Material selection using preferential ranking methods, Mater. Des., 35, pp. 384-393, (2012)
  • [9] Chatterjee P., Athawale V.M., Chakraborty S., Selection of industrial robots using compromise ranking and outranking methods, Rob. Comput. Integr. Manuf., 26, pp. 483-489, (2010)
  • [10] Cochran D.S., Eversheim W., Kubin G., Sesterhenn M.L., The application of axiomatic design and lean management principles in the scope of production system segmentation, Int. J. Prod. Res., 38, 6, pp. 1377-1396, (2000)