共 30 条
- [1] Attri R., Grover S., A comparison of production system life cycle models, Front. Mech. Eng., 7, 3, pp. 305-311, (2012)
- [2] Bellgran M., Safsten K., Production Development: Design and Operation of Production Systems, (2010)
- [3] Bellgran M., Gullander P., Harlin U., (2002)
- [4] Byun H.S., Lee K.S., A decision support system for the selection of a rapid prototyping process using the modified TOPSIS method, Int. J. Adv. Manuf. Technol., 26, pp. 1338-1347, (2004)
- [5] Chakraborty S., Applications of the MOORA method for decision making in manufacturing environment, Int. J. Adv. Manuf. Technol., 54, pp. 1155-1166, (2011)
- [6] Chakraborty S., Banik D., Design of a material handling equipment selection model using analytic hierarchy process, Int. J. Adv. Manuf. Technol., 28, pp. 1237-1245, (2006)
- [7] Chase R.B., Aquilano N.J., Production and Operations Management: A Life Cycle Approach, (1977)
- [8] Chatterjee P., Chakraborty S., Material selection using preferential ranking methods, Mater. Des., 35, pp. 384-393, (2012)
- [9] Chatterjee P., Athawale V.M., Chakraborty S., Selection of industrial robots using compromise ranking and outranking methods, Rob. Comput. Integr. Manuf., 26, pp. 483-489, (2010)
- [10] Cochran D.S., Eversheim W., Kubin G., Sesterhenn M.L., The application of axiomatic design and lean management principles in the scope of production system segmentation, Int. J. Prod. Res., 38, 6, pp. 1377-1396, (2000)