共 50 条
- [41] New Multiple Time Grid Continuous-Time Formulation for the Cyclic Scheduling of an Industrial Batch Plant 24TH EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING, PTS A AND B, 2014, 33 : 1807 - 1812
- [43] PILOT-PLANT TEST PROGRAM FOR THE BRIQUETTING, PRE-REACTING, AND MELTING OF GLASS BATCH .2. INTERPRETATION OF RESULTS AMERICAN CERAMIC SOCIETY BULLETIN, 1979, 58 (11): : 1086 - 1089
- [44] PILOT-PLANT TEST PROGRAM FOR THE BRIQUETTING, PRE-REACTING, AND MELTING OF GLASS BATCH .1. TESTS AND RESULTS AMERICAN CERAMIC SOCIETY BULLETIN, 1979, 58 (11): : 1080 - 1085
- [45] NEW SECONDARY-TREATMENT PLANT IS 1ST STEP IN RENEWING NEW-JERSEY BEACHFRONT WATER-ENGINEERING & MANAGEMENT, 1986, 133 (10): : 14 - 14
- [49] New batch control system boosts solvent plant: Upgrading obsolete controls helps improve quality control and throughput Chemical Processing, 2019, 81 (01):