共 26 条
[1]
Bernstein J.I., Hernandez J., Rodriguez J.M., Ros A.J., X-factor updating and total factor productivity growth: The case of Peruvian telecommunication, 1996 2003, Journal of Regulatory Economics, 30, 3, pp. 316-342, (2006)
[2]
Kontodimopoulos N., Niakas D., A 12-year analysis of malmquist total factor productivity in dialysis, Journal of Medical Systems, 30, 5, pp. 333-342, (2006)
[3]
Losee R.M., Percent perfect performance (PPP), Information Processing and Management, 43, 4, pp. 1020-1029, (2007)
[4]
Maxwell G.R., Edwards V.H., Robertson M., Shah K., Assuring process safety in the transfer of hydrogen cyanide manufacturing technology, Journal of Hazardous Materials, 142, 3, pp. 677-684, (2007)
[5]
Murakami Y., Technology spillover from foreign-owned firms in Japanese manufacturing industry, Journal of Asian Economics, 18, 2, pp. 284-293, (2007)
[6]
Olsen E.O., Ward P.T., Performance measurement system simplicity, International Journal of Manufacturing Technology and Management, 8, 4, pp. 330-354, (2006)
[7]
Park S.S., Lee H.J., Lee K.Y., Hwang Y., A study on manufacturing technology for an inclined polygon mirror, Journal of Materials Processing Technology, 187-188, pp. 56-59, (2007)
[8]
Parkan C., Bench marking operational performance: The case of two hotels, International Journal of Productivity and Performance Management, 54, 8, pp. 679-696, (2005)
[9]
Parkan C., On OCRA: Response to comments by Wang (2004), European Journal of Operational Research, 169, 1, pp. 332-337, (2006)
[10]
Parkan C., Wu M., Measurement of the performance of an investment bank using the operational competitiveness rating procedure, Omega, 27, 2, pp. 201-217, (1999)