共 50 条
- [21] Application of fuzzy mathematics in the investment risk analysis of stadium project Huang, C. (changwuhang@yeah.net), 1600, Advanced Institute of Convergence Information Technology, Myoungbo Bldg 3F,, Bumin-dong 1-ga, Seo-gu, Busan, 602-816, Korea, Republic of (04):
- [22] Fuzzy optimization of construction engineering project schedule based on critical chain management Liu, J. (Liujb71@sina.cn), 2013, Universitas Ahmad Dahlan, Jalan Kapas 9, Semaki, Umbul Harjo,, Yogiakarta, 55165, Indonesia (11):
- [23] Optimization of Project Schedule Crashing CONSTRUCTION RESEARCH CONGRESS 2016: OLD AND NEW CONSTRUCTION TECHNOLOGIES CONVERGE IN HISTORIC SAN JUAN, 2016, : 708 - 717
- [25] Hydropower production schedule optimization using genetic algorithms 2012 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION, QUALITY AND TESTING, ROBOTICS, THETA 18TH EDITION, 2012, : 240 - 243
- [26] Government Guide Mechanism for Overseas Hydropower Project Investment PROCEEDINGS OF THE AASRI INTERNATIONAL CONFERENCE ON INDUSTRIAL ELECTRONICS AND APPLICATIONS (IEA 2015), 2015, 2 : 560 - 563
- [27] The Application of Fuzzy Comprehensive Evaluation Method in Project Risk Assessment PROCEEDINGS OF 2010 INTERNATIONAL CONFERENCE ON RISK AND RELIABILITY MANAGEMENT, 2010, : 198 - +
- [28] Study on Risk Management by Fuzzy Comprehensive Evaluation in Hydraulic Project PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE ON SUSTAINABLE CONSTRUCTION & RISK MANAGEMENT, VOLS I AND II, 2010, : 106 - 110
- [29] Investment Risk Evaluation in Real Estates Based on Fuzzy Comprehensive Analysis PROCEEDINGS OF THE 5TH INTERNATIONAL CONFERENCE ON PRODUCT INNOVATION MANAGEMENT, VOLS I AND II, 2010, : 1325 - 1329
- [30] Gray comprehensive assessment of investment risk for large-scale water conservancy and hydropower projects Proceedings of CRIOCM 2006 International Research Symposium on Advancement of Construction Management and Real Estate, Vols 1 and 2, 2006, : 883 - 888