共 9 条
- [1] Zhou Y., Xu S., A preliminary investigation on data center in smart substation, Automation of Electric Power Systems, 35, 18, pp. 57-61, (2011)
- [2] Zhu Y., Wang D., Di J., Et al., Implementation of a new power telecontrol system base on IEC 61850, Journal of North China Electric Power University, 35, 6, pp. 58-61, (2008)
- [3] Fan J., Mu L., Zhan X., Et al., Data modeling for substation SCADA system based on IEC 61850 standard, Automation of Electric Power Systems, 30, 5, pp. 43-47, (2006)
- [4] Wang W., Feasibility analysis of IEC 61850 used as substation telecontrol protocol, Automation of Electric Power Systems, 36, 17, pp. 109-112, (2012)
- [5] Chen A., Yue Q., Feng J., Et al., Application of IEC 61850 proxy server in seamless communication between smart substation and control center, Automation of Electric Power Systems, 34, 20, pp. 99-102, (2010)
- [6] Du J., Qi Z., New communication proxy server of substation based on IEC 61850, Electric Power Automation Equipment, 31, 2, pp. 112-115, (2011)
- [7] Sedna XML database
- [8] Xu Y., Zhang L., Ye S., Research of RCB and LCB of IEC 61850 standard, Power System Protection and Control, 37, 18, pp. 139-141, (2009)
- [9] Zhang R., Ren C., He C., IEC 61850 report model and its application problems discussion, Power System Protection and Control, 37, 6, pp. 93-97, (2009)