A waste reduction strategy through autonomation under a closed-loop supply chain management

被引:0
作者
Sarkar, Biswajit [1 ,2 ,3 ]
Ghosh, Santanu Kumar [4 ]
Mishra, Mowmita [4 ]
机构
[1] Yonsei Univ, Dept Ind Engn, 50 Yonsei Ro, Seoul 03722, South Korea
[2] Saveetha Univ, Saveetha Inst Med & Tech Sci, Saveetha Med Coll, Ctr Global Hlth Res, Chennai 600077, Tamil Nadu, India
[3] Lovely Profess Univ, Dept Math, Phagwara 144411, Punjab, India
[4] Kazi Naazrul Univ, Dept Math, Asansol 713340, W Bengal, India
关键词
Closed-loop supply chain management; imperfect production; transportation; remanufacturing; marketing; NETWORK DESIGN; SETUP COST; MODEL; FUZZY; SYSTEM; COORDINATION; INVENTORY; SELECTION; REWORK; ERRORS;
D O I
10.1051/ro/2023180
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
Currently, apart from manufacturing processes, the remanufacturing of products is considerably important. Appropriate remanufacturing requires the operation of long-run manufacturing systems. However, in long-run processes, the production system may convert to an out-of-control state due to machine breakdowns. Then, defective products are frequently produced; this increases wastage and disrupts environmental sustainability. In this model, a smart autonomation policy is deliberated for an error-free inspection in separating defective products during production. The autonomation policy facilitates waste reduction through remanufacturing. This paper concentrates on customer awareness and service-dependent demand, which directly improves the overall profitability of the system. A discrete investment to reduce setup cost, continuous investment to collect used goods, and cap-and-trade strategy to limit carbon emission are considered to obtain a more realistic model. Classical optimization method is applied for global maximum profit test of the profit function with respect to cycle length, customer awareness, service investment, discrete investment to reduce setup cost, number of shipments, and container capacities. Numerical testing, sensitivity to total profit in different cost parameters, and comparisons with previous research are explained. Some special scenarios including graphical representations are discussed to prove that a large investment is more beneficial than the cost of specific setup and collection.
引用
收藏
页码:3947 / 3984
页数:38
相关论文
共 52 条
[1]   Pricing, collection, and effort decisions with coordination contracts in a fuzzy, three-level closed-loop supply chain [J].
Alamdar, Safoura Famil ;
Rabbani, Masoud ;
Heydari, Jafar .
EXPERT SYSTEMS WITH APPLICATIONS, 2018, 104 :261-276
[2]   Product-specified dual-channel retail management with significant consumer service [J].
Amankou, Kunomboua Anicet Cyrille ;
Guchhait, Rekha ;
Sarkar, Biswajit ;
Dem, Himani .
JOURNAL OF RETAILING AND CONSUMER SERVICES, 2024, 79
[3]   Effects of uncertainty on a tire closed-loop supply chain network [J].
Amin, Saman Hassanzadeh ;
Zhang, Guoqing ;
Akhtar, Pervaiz .
EXPERT SYSTEMS WITH APPLICATIONS, 2017, 73 :82-91
[4]   An integrated model for closed-loop supply chain configuration and supplier selection: Multi-objective approach [J].
Amin, Saman Hassanzadeh ;
Zhang, Guogqing .
EXPERT SYSTEMS WITH APPLICATIONS, 2012, 39 (08) :6782-6791
[5]  
Chaudhari U., 2023, Math. Comput. Simul
[6]   An optimal production and inspection strategy with preventive maintenance error and rework [J].
Chen, Yan-Chun .
JOURNAL OF MANUFACTURING SYSTEMS, 2013, 32 (01) :99-106
[7]   Effect of variable carbon emission in a multi-objective transportation-p-facility location problem under neutrosophic environment [J].
Das, Soumen Kumar ;
Roy, Sankar Kumar .
COMPUTERS & INDUSTRIAL ENGINEERING, 2019, 132 :311-324
[8]   Cost-effective smart autonomation policy for a hybrid manufacturing-remanufacturing [J].
Dey, Bikash Koli ;
Sarkar, Biswajit ;
Seok, Hyesung .
COMPUTERS & INDUSTRIAL ENGINEERING, 2021, 162
[9]   Involvement of controllable lead time and variable demand for a smart manufacturing system under a supply chain management [J].
Dey, Bikash Koli ;
Bhuniya, Shaktipada ;
Sarkar, Biswajit .
EXPERT SYSTEMS WITH APPLICATIONS, 2021, 184
[10]   Autonomation policy to control work-in-process inventory in a smart production system [J].
Dey, Bikash Koli ;
Pareek, Sarla ;
Tayyab, Muhammad ;
Sarkar, Biswajit .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2021, 59 (04) :1258-1280