Headrace tunnel and tailrace tunnel of the Beles MPP in Ethiopia

被引:0
|
作者
Druckstollen und Unterwasserstollen des Wasserkraftwerks Beles in Äthiopien
机构
[1] Vigl, Alois
[2] Gerstner, Reinhold
[3] Bartimoccia, Francesco
[4] Cruciani, Marco
来源
| 1600年 / Ernst und Sohn卷 / 06期
关键词
Auskleidungskonzept - Auskleidungsplanung - Depletion - Entleerung - Hydropower plants - Pressure tunnel - Probebetrieb - Test operations;
D O I
10.1002/geot.201300038
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [1] 8 M DIAMETER 7 KM LONG BELES TAILRACE TUNNEL (ETHIOPIA) BORED AND LINED IN BASALTIC FORMATIONS IN LESS THAN 12 MONTHS
    Raschilla, Antonio
    Bartimoccia, Francesco
    2009 RAPID EXCAVATION AND TUNNELING CONFERENCE, PROCEEDINGS, 2009, : 1235 - 1247
  • [2] From headrace to tailrace
    Willis, D., 1600, Mining Communications Ltd
  • [3] Study on the disruption of water flow in the system of tailrace tunnel combined with diversion tunnel
    Li Ling
    Yang Jiandong
    Liu Meiqing
    27TH IAHR SYMPOSIUM ON HYDRAULIC MACHINERY AND SYSTEMS (IAHR 2014), PTS 1-7, 2014, 22
  • [4] Refurbishment of the tailrace tunnel at La Fortuna, Panama
    Marois, S.
    International Journal on Hydropower and Dams, 2000, 7 (02): : 48 - 50
  • [5] Challenges in constructing the headrace tunnel for Tapovan Vishnugad, India
    NTPC Ltd, Engineering Office Complex A-8A, Sector 24, Noida, Uttar Pradesh, 201301, India
    Int J Hydropower Dams, 2009, 1 (56-60): : 56 - 60
  • [6] Numerical Verification of Empirically Designed Support for a Headrace Tunnel
    Akram, Mian Sohail
    Ahmed, Luqman
    Ullah, Muhammad Fahad
    Rehman, Faisal
    Ali, Muhammad
    CIVIL ENGINEERING JOURNAL-TEHRAN, 2018, 4 (11): : 2575 - 2587
  • [7] Headrace tunnel of the El Alto hydropower project in Panama
    Druckstollen des wasserkraftprojekts El Alto in Panama
    1600, Ernst und Sohn (06):
  • [8] Effective ventilating length of tailrace tunnel in hydropower stations
    Yu, Yan-Shun
    Zhang, Shao-Fan
    Niu, Yan-Qing
    Zhao, Yong-Jun
    Nanjing Li Gong Daxue Xuebao/Journal of Nanjing University of Science and Technology, 2009, 33 (01): : 127 - 131
  • [9] Second Manapouri tailrace tunnel design and construction considerations
    Heer, B
    Essex, R
    Young, D
    1997 RAPID EXCAVATION AND TUNNELING CONFERENCE, PROCEEDINGS, 1997, : 3 - 23
  • [10] An introduction to the construction of Headrace Tunnel by TBM in Shihlin hydropower project
    Fu, CC
    Chen, TH
    Hsiao, TH
    COMPUTER METHODS AND ADVANCES IN GEOMECHANICS, VOL 2, 1997, : 1283 - 1288