Rock breaking mechanism of TBM cutter based on MatDEM

被引:0
作者
Xue Y.-D. [1 ,2 ]
Zhou J. [1 ,2 ]
Zhao F. [3 ]
Li X. [1 ,2 ]
机构
[1] Key Laboratory of Geotechnical and Underground Engineering of Education Ministry, Tongji University, Shanghai
[2] Department of Geotechnical Engineering, Tongji University, Shanghai
[3] China State Silk Road Construction Investment Group Co., Ltd., Xi'an, 710075, Shaanxi
来源
Yantu Lixue/Rock and Soil Mechanics | 2020年 / 41卷
基金
中国国家自然科学基金;
关键词
Cutting force; Discrete element; Full-section tunnel-boring machine(TBM); MatDEM software; Rock breaking mechanism;
D O I
10.16285/j.rsm.2019.1656
中图分类号
学科分类号
摘要
The full-section tunnel-boring machine(TBM) is widely used in the tunnel construction due to many advantages include high efficiency, safety and environmental protection etc. The rock breaking mechanism of the TBM cutter is the essence deciding the design and construction of TBM. The rock will break when it interacts with the TBM cutter. The discrete element method (DEM) has become an effective means to study the rock breaking mechanism of the cutter. However, the dimension of the numerical model generated by most discrete element softwares is relatively small and the simplified two-dimensional models are always applied, which has an obvious size effect. The MatDEM software based on discrete element method is used to construct a large-scale 3D model of rock breaking cutter, thus simulating the real rock breaking process of the cutter. The clustering unit is used to simulate the rigid cutter, which can realize the dynamic process of rock breaking under different conditions using the double cutters. The forces of cutters during the rock breaking process can be monitored, and the force model of cutters and variation of specific energy (SE) under different cutters spacing/penetration ratio (S/P) are calculated and analyzed. The simulation results show that the cutting force is a complex and irregular impact load during the rock breaking process. It is related with the cutting parameters, rock properties etc. The increase in the penetration depth and the cutters spacing requires a much higher force to break the rock. For a specific rock, there is an optimal ratio of the spacing/penetration degree, making the minimum SE for rock breaking. The MatDEM software can better simulate the rock breaking process of the cutter, which matches well with the indoor linear cutting test, thus it is beneficial to comprehensively explore the rock breaking mechanism. © 2020, Science Press. All right reserved.
引用
收藏
页码:337 / 346
页数:9
相关论文
共 22 条
[1]  
GONG Qiu-ming, Introduction to tunnel boring machine tunneling, (2014)
[2]  
MAN Lin-tao, LI Shou-ju, Finite element numerical simulation of rock-breaking process of disc cutter, Construction, 43, 4, pp. 1-5, (2011)
[3]  
GONG Qiu-ming, HE Guan-wen, ZHAO Xiao-bao, Et al., Influence of different penetration degree on rock breaking efficiency of roadhead cutter, Modern Tunnel Technology, 53, 1, pp. 62-68, (2016)
[4]  
ROSTAMI J, OZDEMIR L., A new model for performance prediction of hard rock TBMs, Proceedings of the Rapid Excavation and Tunneling Conference, pp. 793-809, (1993)
[5]  
BRULAND A., Hard rock tunnel boring, (1998)
[6]  
BARTON N., TBM performance estimation in rock using QTBM, Tunnels and Tunneling International, 31, 9, pp. 30-33, (1999)
[7]  
CHOI S O, LEE S J., Numerical study to estimate the cutting power on a disc cutter in jointed rock mass, KSCE Journal of Civil Engineering, 20, 1, pp. 440-451, (2016)
[8]  
LABRA C, ROJEK J, ONATE E., Discrete/finite element modelling of rock cutting with a TBM disc cutter, Rock Mechanics and Rock Engineering, 50, 3, pp. 621-638, (2017)
[9]  
ZHANG X P, JI P Q, LIU Q, Et al., Physical and numerical studies of rock fragmentation subject to wedge cutter indentation in the mixed ground, Tunnelling and Underground Space Technology, 71, pp. 354-365, (2018)
[10]  
SUN Jin-shan, CHEN Ming, CHEN Bao-guo, Et al., Numerical simulation of influencing factors of rock breaking process of TBM cutter, Rock and Soil Mechanics, 32, 6, pp. 1891-1897, (2011)