Construction Control of Hoisting and Installation of Arch Rib of a Half-Through CFST Stiff Skeleton Arch Bridge

被引:0
|
作者
机构
[1] [1,Yao, Guo-Wen
[2] 1,Chao, Yang
[3] 1,Wu, Hai-Jun
[4] 1,Qu, Hao-Ran
来源
| 1600年 / Wuhan Bridge Research Institute卷 / 47期
基金
中国国家自然科学基金;
关键词
Geometry - Arch bridges - Concretes - Cranes - Tubular steel structures - Musculoskeletal system - Arches;
D O I
暂无
中图分类号
学科分类号
摘要
The main bridge of the Guansheng Qujiang River Bridge in Guang'an is a half-through concrete-filled steel tube (CFST) stiff skeleton arch bridge with the main span of 320 m. The stiff skeleton of the bridge was constructed, using the fastening stay method and in the construction, the fastening stays were tensioned in place in one time. In view of the limitations of the 2 calculation methods of the forward analysis and reverse analysis for the stay forces and to accurately calculate the stay forces and the pre-raising amounts of the arch rib segments in the installation and make the completed arch geometric shape approximate the theoretic geometric shape, the adjustment method of the optimal stay forces based on the control target of the completed arch geometric shape was proposed. The MIDAS Civil 2015 was used to set up the finite element model for the whole bridge at the hoisting and installation stages of the arch rib segments, the influences of the tangent displacement on the follow-up construction stages were considered and by controlling the geometric shape mainly and the stay forces subsidiarily, the geometric shape, fastening stay forces, backstay forces and the chord stresses of the bridge were analyzed and the analysis was compared to the measured values. The results show that the measured values of the geometric shape, fastening stay forces, backstay forces and the chord stresses are highly accordant with the theoretic values, the geometric shape and structural stresses of the main arch can satisfy the relevant requirements in the design and codes, proving that the adjustment method as mentioned is feasible and effective. © 2017, Journal Press, China Railway Bridge Science Research Institute, Ltd. All right reserved.
引用
收藏
相关论文
共 50 条
  • [1] Force analysis of arch rib of half-through irregular CFST-tied arch bridge during construction stage
    Li, Jianning
    Sun, Xuexian
    Li, Ziqi
    Lu, Wei
    INTERNATIONAL JOURNAL OF CRITICAL INFRASTRUCTURES, 2021, 17 (04) : 298 - 316
  • [2] Research on the Construction Control of Arch Rib of Concrete-filled Steel Tube Stiff Skeleton Arch Bridge
    Xu, Hong
    Zhou, Mi
    Wang, Yamei
    Xu, Ruilong
    Journal of Railway Engineering Society, 2022, 39 (09) : 50 - 55
  • [3] Construction Controls for a Half-Through Tied Arch Bridge in China
    Tang, Chunyan
    Zheng, Li
    Zhang, Zhe
    STRUCTURAL ENGINEERING INTERNATIONAL, 2014, 24 (04) : 557 - 561
  • [4] Influence of transverse brace arrangement on dynamic characteristics of a half-through CFST arch bridge
    Yun, Di
    Zhang, Su-Mei
    Harbin Gongye Daxue Xuebao/Journal of Harbin Institute of Technology, 2003, 35 (SUPPL.): : 259 - 262
  • [5] Calculating Method of Arch Rib Installation Alignment of Large Span Cable Hoisting Arch Bridge
    Xiong Shaohui
    Chen Wei
    Wang Feng
    INTERNATIONAL CONFERENCE ON SMART TRANSPORTATION AND CITY ENGINEERING 2021, 2021, 12050
  • [6] Analysis of traveling wave effect on half-through CFST arch bridge by large mass method
    Ma, J. (amajunlxd@163.com), 1600, Trans Tech Publications Ltd (540):
  • [7] Reasonable inclination of large-span half-through CFST arch bridge with inclined ribs
    School of Civil Engineering, Harbin Institute of Technology, Harbin 150090, China
    Harbin Gongye Daxue Xuebao, 2007, SUPPL. 2 (628-632):
  • [8] Construction Control Technology of Cable Hoisting System for the Arch Rib of Steel Box Bridge
    Wang, Yu
    Wei, Yanhong
    Hu, Guifen
    ADVANCED CONSTRUCTION TECHNOLOGIES, 2014, 919-921 : 1403 - +
  • [9] Study on Suspender's Fatigue Performance of Half-through CFST Arch Bridge Due to Vehicular Loads
    Sun, Hang
    Ma, Jun
    Yu, Bo
    ADVANCES IN INTELLIGENT TRANSPORTATION SYSTEM AND TECHNOLOGY, 2012, 5 : 189 - +
  • [10] Dynamic Behavior Of Cfrp Hangers In a Half-Through Arch Bridge
    Li, Jinfeng
    Gao, Jing
    2019 INTERNATIONAL CONFERENCE ON SMART GRID AND ELECTRICAL AUTOMATION (ICSGEA), 2019, : 173 - 178