共 50 条
- [32] Ground Surface Settlement Induced by Large Diameter Jacking-pipe Construction in Pipe-roof Pre-construction Method Gongcheng Kexue Yu Jishu/Advanced Engineering Sciences, 2020, 52 (04): : 141 - 148
- [33] Lubrication property requirements for injection into over-cutting area using extra-large-diameter slurry pipe jacking Int. Soc. Trenchless Technol. - No-Dig Int. Conf. Exhibit., No-Dig MOSCOW, (296-300):
- [34] Horizontal dynamic response of a large-diameter pipe pile considering the second-order effect of axial force Earthquake Engineering and Engineering Vibration, 2018, 17 : 567 - 579
- [37] Study on the Deformation Induced by Vertical Two-Layer Large Diameter Pipe-Jacking in the Soil-Rock Composite Stratum APPLIED SCIENCES-BASEL, 2022, 12 (24):
- [40] Surface subsidence caused by construction of large diameter curved jacking-pipes in pipe-roof pre-construction method Zhongnan Daxue Xuebao (Ziran Kexue Ban)/Journal of Central South University (Science and Technology), 2013, 44 (11): : 4687 - 4693