Estimation of graphite dust resuspension in steam generator of HTR-10

被引:0
|
作者
Institute of Nuclear Energy Technology of Tsinghua University, Beijing [1 ]
100084, China
不详 [2 ]
100084, China
机构
来源
Hedongli Gongcheng | / 4卷 / 172-176期
关键词
Dust deposition - Film boiling - Friction velocity - Graphite particles - Heating period - Physical parameters - Re-suspension - Short-term effects;
D O I
10.13832/j.jnpe.2014.04.0172
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [31] Commissioning of HTR-10 before fueling
    Su, Qing-Shan
    Wang, Rui-Pian
    Chen, Hua
    Hu, Shou-Yin
    Liang, Xi-Hua
    Sun, Shuan-Liang
    2001, Yuan Zi Neng Chuban She (22):
  • [32] Digital protection system in HTR-10
    Li, Fu
    An, Zhen-Cai
    Zhang, Liang-Ju
    Yang, Zi-Jue
    Hedongli Gongcheng/Nuclear Power Engineering, 2001, 22 (06): : 508 - 512
  • [33] The helium purification system of the HTR-10
    Yao, MS
    Wang, RP
    Liu, ZY
    He, XD
    Li, J
    NUCLEAR ENGINEERING AND DESIGN, 2002, 218 (1-3) : 163 - 167
  • [34] Experimental study on the content and distribution of key nuclides in an irradiated graphite sphere of HTR-10
    Li, Hong
    Liu, Xuegang
    Xie, Feng
    Jia, Fuming
    NUCLEAR ENGINEERING AND DESIGN, 2017, 323 : 39 - 45
  • [35] HTR-10的燃料管理
    吴宗鑫
    经荥清
    清华大学学报(自然科学版), 2001, (自然科学版) : 120 - 123
  • [36] HTR-10全厂断电试验
    孙卫东
    贾立新
    周世新
    玉辰生
    李江博
    孙中民
    陈光建
    核动力工程, 2001, (06) : 513 - 515
  • [37] HTR-10装料前的调试
    苏庆善
    王瑞偏
    陈华
    胡守印
    梁锡华
    孙栓樑
    核动力工程, 2001, (06) : 538 - 541
  • [38] Gas transportation of fuel element in HTR-10
    Liu, Ji-Guo
    Liang, Xi-Hua
    Huang, Peng
    Hedongli Gongcheng/Nuclear Power Engineering, 2001, 22 (06): : 526 - 529
  • [39] Source Term Analysis of Tritium in HTR-10
    Xu, Yi
    Li, Hong
    Xie, Feng
    Cao, Jianzhu
    Tong, Jiejuan
    FUSION SCIENCE AND TECHNOLOGY, 2017, 71 (04) : 671 - 678
  • [40] HTR-10燃耗自动测量系统
    马涛
    胡守印
    梁锡华
    黄鹏
    核动力工程, 2007, (03) : 56 - 60