共 13 条
- [1] Wang L., Chen Y., Ma H., Et al., Production Planning and Control, (2007)
- [2] Aghezzaf E.H., Jamali M.A., Ait-Kadin D., An integrated production and preventive maintenance planning model, European Journal of Operational Research, 181, 2, pp. 679-685, (2007)
- [3] Aghezzaf E.H., Najid N.M., Integrated production planning and preventive maintenance in deteriorating production systems, Information Sciences, 178, 17, pp. 3382-3392, (2008)
- [4] Nourelfath M., Fitouhi M., Machani M., An integrated model for production and preventive maintenance planning in multi-state systems, IEEE Transactions on Reliability, 59, 3, pp. 496-506, (2010)
- [5] Fitouhi M.C., Nourelfath M., Integrating noncyclical preventive maintenance scheduling and production planning for a single machine, International Journal of Production Economics, 136, 2, pp. 344-351, (2012)
- [6] Fitouhi M.C., Nourelfath M., Integrating noncyclical preventive maintenance scheduling and production planning for multi-state systems, Reliability Engineering & System Safety, 121, 1, pp. 175-186, (2014)
- [7] Najid N.M., Alaoui M., Mohafid B., An integrated production and maintenance planning model with time windows and shortage cost, International Journal of Production Research, 49, 8, pp. 2265-2283, (2011)
- [8] Wang S., Integrated model of production planning and imperfect preventive maintenance policy for single machine system, International Journal of Operational Research, 18, 2, pp. 140-156, (2013)
- [9] Zhu H., Guo L., Liu F., Et al., Selective maintenance method for series parallel system under production lot constraint, Computer Integrated Manufacturing Systems, 17, 2, pp. 419-424, (2011)
- [10] Lu Z.Q., Zhang Y.J., Han X.L., Integrating run-based preventive maintenance into the capacitated lot sizing problem with reliability constraint, International Journal of Production Research, 51, 5, pp. 1379-1391, (2013)