Permissible delay in payments in the two-echelon inventory system with controllable setup cost and lead time under Service Level Constraint

被引:0
|
作者
Uthayakumar, R. [1 ]
Priyan, S. [1 ]
机构
[1] Department of Mathematics, Gandhigram Rural Institute, Deemed University, Gandhigram - 624, 302, Tamil Nadu, India
来源
International Journal of Information and Management Sciences | 2013年 / 24卷 / 03期
关键词
Compendex;
D O I
暂无
中图分类号
学科分类号
摘要
Cost reduction
引用
收藏
页码:193 / 211
相关论文
共 50 条
  • [41] A two-level distribution inventory system with stochastic lead time at the lower echelon
    Thangam, A.
    Uthayakumar, R.
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 41 (11-12): : 1208 - 1220
  • [42] A two-level distribution inventory system with stochastic lead time at the lower echelon
    A. Thangam
    R. Uthayakumar
    The International Journal of Advanced Manufacturing Technology, 2009, 41 : 1208 - 1220
  • [43] A two-level distribution inventory system with stochastic lead time at the lower echelon
    Thangam, A.
    Uthayakumar, R.
    International Journal of Advanced Manufacturing Technology, 2009, 41 (11-12): : 1208 - 1220
  • [44] An integrated inventory model under conditions of order processing cost reduction and permissible delay in payments
    Huang, Chao-Kuei
    APPLIED MATHEMATICAL MODELLING, 2010, 34 (05) : 1352 - 1359
  • [45] A periodic review integrated inventory model with controllable safety stock and setup cost under service level constraint and distribution-free demand
    Kurdhi, N. A.
    Jamaluddin, A.
    Jauhari, W. A.
    Saputro, D. R. S.
    INTERNATIONAL CONFERENCE ON MATHEMATICS: EDUCATION, THEORY AND APPLICATION, 2017, 855
  • [46] at]Mixture Inventory Model Involving Setup Cost Reduction with a Service Level Constraint
    Liang-Yuh Ouyang
    Hung-Chi Chang
    OPSEARCH, 2000, 37 (4) : 327 - 339
  • [47] A note on periodic review inventory model with controllable setup cost and lead time
    Chuang, Bor-Ren
    Ouyang, Liang-Yuh
    Chuang, Kai-Wayne
    Comp. Oper. Res., 1600, 4 (549-561):
  • [48] A note on periodic review inventory model with controllable setup cost and lead time
    Chuang, BR
    Ouyang, LY
    Chuang, KW
    COMPUTERS & OPERATIONS RESEARCH, 2004, 31 (04) : 549 - 561
  • [49] Optimizing production-inventory replenishment and lead time decisions under a fill rate constraint in a two-echelon sustainable supply chain with quality issues
    Castellano, Davide
    Gabbrielli, Roberto
    Gallo, Mose
    Giri, Bibhas C. C.
    Sarkar, Sumon
    INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE-OPERATIONS & LOGISTICS, 2023, 10 (01)
  • [50] Comparative research on three-echelon and two-echelon medicine inventory model with positive lead-time
    Zhu, Li
    Wang, Haiyan
    Zhao, Lindu
    Journal of Southeast University (English Edition), 2005, 21 (04) : 500 - 505