共 50 条
- [31] A two-echelon single-period inventory control problem under budget constraint The International Journal of Advanced Manufacturing Technology, 2011, 56 : 1205 - 1214
- [32] A two-echelon integrated inventory model under generalized lead time distribution with variable backordering rate International Journal of System Assurance Engineering and Management, 2019, 10 : 552 - 562
- [36] Integrated vendor–buyer cooperative inventory model with controllable lead time, ordering cost reduction, and service-level constraint The International Journal of Advanced Manufacturing Technology, 2013, 65 : 657 - 666
- [38] A Two-warehouse Inventory Model for Items under Conditions of Permissible Delay in Payments IEEE/SOLI'2008: PROCEEDINGS OF 2008 IEEE INTERNATIONAL CONFERENCE ON SERVICE OPERATIONS AND LOGISTICS, AND INFORMATICS, VOLS 1 AND 2, 2008, : 2995 - 3000
- [39] A theorem on the optimal cycle time for EPQ inventory model under permissible delay in payments JOURNAL OF INFORMATION & OPTIMIZATION SCIENCES, 2009, 30 (02): : 359 - 365
- [40] An EOQ Model Under the Condition of Permissible Delay in Payments with Allowed Stock-Out Cost and Lead Time CONTEMPORARY MATHEMATICS, 2024, 5 (01): : 628 - 634