共 50 条
- [26] A periodic review integrated inventory model with controllable setup cost, imperfect items, and inspection errors under service level constraint INTERNATIONAL CONFERENCE ON INFORMATICS, TECHNOLOGY AND ENGINEERING 2017 (INCITE 2017), 2017, 273
- [30] A two-echelon single-period inventory control problem under budget constraint INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 56 (9-12): : 1205 - 1214