共 15 条
- [1] Monika R., Kanchan J., Isha D., Estimation of reliability for parallel networked phased mission systems with unobserved subsystem operational times, Quality and Safety Engineering, 22, 3, pp. 155-161, (2015)
- [2] Roger G., Juliano D.P.P., Helio L.H., Et al., A maximum power point tracking system with parallel connection for PV stand-alone applications, IEEE Trans. on Industrial Electronics, 33, 7, pp. 2674-2683, (2008)
- [3] Yu X.X., Ashwin M.K., Reliability analysis and cost optimization of parallel-inverter system, IEEE Trans. on Reliability, 61, 2, pp. 543-548, (2012)
- [4] Toshio N., Zhao X.F., Optimization problems of a parallel system with a random number of units, International Journal of System Assurance Engineering and Management, 5, 4, pp. 554-561, (2014)
- [5] Takagi H., Queueing Analysis: A Foundation of Performance Evaluation Vacation and Priority Systems, (1991)
- [6] Li Y.D., Hu L.M., Gaver's parallel system with two failure modes and a cold standby unit, Journal of Computational Information Systems, 6, 10, pp. 3373-3380, (2010)
- [7] Isijola-Adakeja O.A., Ibe O.C., M/M/1 multiple vacation queueing systems with differentiated vacations and vacation interruptions, IEEE Access, 2, 3, pp. 1384-1395, (2014)
- [8] Hu L.M., Yue D.Q., Tian R.L., Parallel repairable system with two types of failure and vacation, Systems Engineering and Electronics, 29, 12, pp. 2180-2184, (2007)
- [9] Neuts M.F., Meier K.S., On the use of phase type distributions in reliability modelling of systems with two components, OR Spektrum, 2, 2, pp. 227-234, (1981)
- [10] Serkan E., Dynamic assessment of multi-state systems using phase-type modeling, Reliability Engineering and Systems Safety, 140, pp. 71-77, (2015)