Modelling open pit dynamics using discrete simulation

被引:16
|
作者
Askari-Nasab, H. [1 ]
Frimpong, S. [2 ]
Szymanski, J. [1 ]
机构
[1] School of Mining and Petroleum Engineering, University of Alberta, Edmonton, AB
[2] Department of Mining and Nuclear Engineering, University of Missouri-Rolla, Rolla, MO
关键词
Open pit mining; Stochastic simulation; Strategic and tactical mine planning;
D O I
10.1080/17480930600720206
中图分类号
学科分类号
摘要
The objective in any mining operation is to exploit ore at the lowest possible cost with the prospect of maximizing profits. The planning of an open pit mine is an economic exercise, constrained by certain geological, operating, technological and local field factors. Heuristic methods, economic parametric analysis, operations research and genetic algorithms have been used to formulate periodic open pit planning problems. Open pit design, optimization and subsequent materials scheduling problems are governed by stochastic dynamic process. Thus, current algorithms are limited in their abilities to address problems arising from these random and dynamic field processes. The primary objective of this study is to use a discrete stochastic simulation to capture the random field processes associated with open pit design and materials scheduling. An open pit production simulator (OPPS), implemented in MATLAB, based on a modified elliptical frustum is used to model the geometry of open pit layout expansion. The simulator mimics the periodic expansion of the open pit layouts. The interaction of the open pit expansion model with the geological and economic block model returns the respective amount of ore, waste, stockpile materials, and the net present value of the venture. A case study of an iron ore deposit with 114 000 blocks was carried out to verify and validate the model. The optimized pit limit was designed using the Lerchs - Grossman algorithm. The best-case annual schedule, generated by the shells node in Whittle Four-X, yielded a net present value (NPV) of $414 million over a 21-year mine life at a discount rate of 10% per annum. The best scenario out of 5000 simulation iterations using OPPS resulted in an NPV of $422 million over the same time span. Further research, based on hybrid stochastic simulation in conjunction with reinforcement learning, can provide a powerful tool for addressing the random field and dynamic processes in long-term open pit planning.
引用
收藏
页码:35 / 49
页数:14
相关论文
共 50 条
  • [21] Slope orientation assessment for open-pit mines, using GIS-based algorithms
    Grenon, Martin
    Laflamme, Amelie-Julie
    COMPUTERS & GEOSCIENCES, 2011, 37 (09) : 1413 - 1424
  • [22] Stability study on the northern batter of MBC Open Pit using Plaxis 3D
    Zhao, Lei
    You, Greg
    ARABIAN JOURNAL OF GEOSCIENCES, 2018, 11 (06)
  • [23] An alternative approach to managing dewatering in an open pit mine
    Brown, Keith
    Trott, Shane
    Nabi, Aadil
    INTERNATIONAL MINE WATER ASSOCIATION SYMPOSIUM (2012: BUNBURY, WESTERN AUSTRALIA) PROCEEDINGS, 2012, : 557 - 567
  • [24] Specifics of Internal Overburden Dumping in Open Pit Mining
    Cheskidov, V., I
    Reznik, A., V
    JOURNAL OF MINING SCIENCE, 2022, 58 (02) : 227 - 233
  • [25] Estimation of large open pit haulage truck requirements
    Blackwell, GH
    CIM BULLETIN, 1999, 92 (1028): : 143 - 149
  • [26] Scheduling of open-pit phosphate mine extraction
    Azzamouri, Ahlam
    Fenies, Pierre
    Fontane, Frederic
    Giard, Vincent
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2018, 56 (23) : 7122 - 7141
  • [27] Characterization of airborne particles in an open pit mining region
    Huertas, Jose I.
    Huertas, Maria E.
    Solis, Dora A.
    SCIENCE OF THE TOTAL ENVIRONMENT, 2012, 423 : 39 - 46
  • [28] Scheduling in iron ore open-pit mining
    Ibrahimov, Maksud
    Mohais, Arvind
    Schellenberg, Sven
    Michalewicz, Zbigniew
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2014, 72 (5-8) : 1021 - 1037
  • [29] Stability analysis of an open pit slope in a chromite mine
    Reddy, Sandi Kumar
    Babu, A. Rajan
    PROCEEDINGS OF THE CONFERENCE ON RECENT ADVANCES IN ROCK ENGINEERING (RARE 2016), 2016, 91 : 470 - 473
  • [30] Scheduling in iron ore open-pit mining
    Maksud Ibrahimov
    Arvind Mohais
    Sven Schellenberg
    Zbigniew Michalewicz
    The International Journal of Advanced Manufacturing Technology, 2014, 72 : 1021 - 1037