Short circuit constrained unit commitment

被引:0
|
作者
Qin L. [1 ]
Lin J. [2 ]
Dai S. [3 ]
Jiang W. [4 ]
Wang H. [5 ]
Zheng W. [5 ]
机构
[1] Key Laboratory of Smart Grid of Ministry of Education (Tianjin University), Nankai District, Tianjin
[2] College of Electronics and Information Engineering, Tongji University, Yangpu District, Shanghai
[3] China Electrical Power Research Institute, Haidian District, Beijing
[4] Electric Power Research Institute of State Grid Fujian Electric Power Corporation Limited, Fuzhou, 350007, Fujian Province
[5] State Grid Tianjin Electric Power Corporation, Hebei District, Tianjin
来源
Lin, Jikeng (mejklin@126.com) | 1600年 / Chinese Society for Electrical Engineering卷 / 36期
关键词
Anti-islanding; Benders decomposition method; Short circuit current; Transmission switching; Unit commitment;
D O I
10.13334/j.0258-8013.pcsee.151824
中图分类号
学科分类号
摘要
Aiming at the problem of short circuit violation in power system, a new co-optimization model of short circuit constrained Unit Commitment and Transmission Switching (UC-TS) problem and its solving method were both proposed. By controlling both UC and TS simultaneously, the solution of the model included both the optimal power generation schedule, and the optimal configuration of the power grid with short circuit constraints. It was difficult to solve directly for large scale system. Because the new model was much more complicated than the one without short circuit constraint. Effective simplifying strategies and decomposition solving method were further proposed. The results of examples demonstrated the effectiveness of the proposed model and algorithm. © 2016 Chin. Soc. for Elec. Eng.
引用
收藏
页码:6049 / 6058
页数:9
相关论文
共 31 条
  • [1] Xu X., Ding T., Wan Q., 220kV power grid district-dividing optimization for limiting fault current, Automation of Electric Power Systems, 33, 22, pp. 98-101, (2009)
  • [2] Chen L., Huang M., Zhang H., Et al., An optimization strategy for limiting short circuit current, Automation of Electric Power Systems, 33, 11, pp. 38-42, (2009)
  • [3] Zhang Y., Cai Z., Li A., Et al., An optimization algorithm for short-circuit current limitation of 500kV power grid by adjusting power grid configuration, Automation of Electric Power Systems, 33, 22, pp. 34-39, (2009)
  • [4] Yang D., Liu Y., Niu X., Integrated decision method of operation schemes for limiting short-circuit currents in district grids, Automation of Electric Power Systems, 34, 12, pp. 34-38, (2010)
  • [5] Liu W., Dan Y., Zhu Y., Et al., A power system analysis software package based comprehensive evaluation method for short-circuit current limitation strategy, Power System Technology, 35, 8, pp. 150-154, (2011)
  • [6] Kong T., Wang H., Liu Y., Et al., On opening 500kV-220kV electromagnetic loop circuit, Electric Power Automation Equipment, 23, 12, pp. 13-16, (2003)
  • [7] Zhang Z., Fan M., Zhou L., Research of breaking up electromagnetic ring in urban power network, Power System Technology, 32, 19, pp. 42-44, (2008)
  • [8] Liu S., Gu Q., Zhang L., Et al., Research on power supply scheme based on partitioning of 500/220kV Tianjin power grid during the 11th five-year plan, Power System Technology, 32, 9, pp. 51-55, (2008)
  • [9] Ma H., Shahidehpour S.M., Marwali M.K.C., Transmission constrained unit commitment based on Benders decomposition, Proceedings of the 1997 American Control Conference, 4, pp. 2263-2267, (1997)
  • [10] Fu Y., Shahidehpour M., Li Z., Security-constrained unit commitment with AC constraints, IEEE Transactions on Power Systems, 20, 3, pp. 1538-1550, (2005)