Construction techniques for closure of side span steel girder of main bridge of Anqing Changjiang River Railway Bridge

被引:0
|
作者
Sun, Jian-Jia [1 ]
机构
[1] Ning'an Railway Co., Ltd., Wuhu 241000, China
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:109 / 113
相关论文
共 50 条
  • [1] Construction Techniques for Side Span Composite Girder of Main Bridge of Qingshan Changjiang River Bridge in Wuhan
    Zhang, Chun-Xin
    Hu, Jun
    Xie, Hong-Yue
    Bridge Construction, 2019, 49 (01) : 1 - 6
  • [2] Construction Techniques for Stiffening Girder of Main Bridge of Yangsigang Changjiang River Bridge in Wuhan
    Li, Lu-Ping
    Li, Xing-Hua
    Luo, Rui-Hua
    Bridge Construction, 2019, 49 (06): : 7 - 12
  • [3] Erection Techniques for Steel Girder over Side Pier of Main Bridge of Third Wuhu Changjiang River Bridge
    Li, Xu
    Liu, Ai-Lin
    Wang, Ling-Xia
    Bridge Construction, 2021, 51 (06) : 132 - 138
  • [5] Static aerodynamic coefficient of steel truss main girder of anqing changjiang river railway bridge under non-orthogonal wind
    Zheng S.
    Guo J.
    Zhang L.
    Xu W.
    1600, Chinese Academy of Railway Sciences (37): : 21 - 26
  • [6] Mid-Span Closure Techniques for Main Bridge of Wuhan Qingshan Changjiang River Highway Bridge
    Yang, Wen-Ming
    Li, Yong
    Qi, Ya
    Bridge Construction, 2019, 49 (05): : 108 - 112
  • [7] Key Construction Techniques for Main Girder of South Branch Navigation Channel Bridge of Bianyuzhou Changjiang River Bridge
    Wang, Fang-Jin
    Zhang, Xiao-Chuan
    Bridge Construction, 2022, 52 (03) : 8 - 15
  • [9] Key Construction Techniques for Main Bridge of Yangsigang Changjiang River Bridge in Wuhan
    Li, Xing-Hua
    Pan, Dong-Fa
    Bridge Construction, 2020, 50 (04) : 9 - 16
  • [10] Key Erection Techniques for Main Bridge Steel Girder of Wuhu Changjiang River Rail-cum-Road Bridge on Shangqiu-Hefei-Hangzhou Railway
    Liu, Ai-Lin
    Li, Xu
    Bridge Construction, 2020, 50 (01) : 1 - 6