Model of railway transportation channel share based on finished dedicated passenger line

被引:0
作者
Peng, Qi-Yuan
Yin, Yong
Yan, Hai-Feng
机构
[1] School of Traffic and Transportation, Southwest Jiaotong University, Chengdu 610031, China
[2] Transportation and Economy Research Institute, China Academy of Railway Sciences, Beijing 100081, China
来源
| 2005年 / Science Press, Beijing, China卷 / 40期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
[21]   Railway transportation chain share ratio model incorporating time threshold [J].
Zhang, Rong ;
Zhu, Li-Chao .
Jiaotong Yunshu Xitong Gongcheng Yu Xinxi/Journal of Transportation Systems Engineering and Information Technology, 2016, 16 (02) :132-138
[22]   Research on the Line Plan of Passenger-like Transport System of Railway Container Based on Transportation Organization Mode [J].
Xia Y. ;
Wei Y. ;
Lai Y. ;
Zhang Q. .
Tiedao Xuebao/Journal of the China Railway Society, 2019, 41 (04) :10-15
[23]   Wuhan - Guangzhou Passenger Dedicated Line (WGPDL)-1000 km Highspeed-Railway-Line in Central China [J].
Kreutzer, M. ;
Kirschke, D. ;
Vogt, L. .
BAUINGENIEUR, 2009, 84 :185-194
[24]   Passenger flow assignment approach to railway passenger transportation network based on combined entropy optimization [J].
Jia, L. (jialm@vip.sina.com), 1600, Southeast University (44) :216-221
[25]   Test of foundation pile selection in New Weinan Railway Station of Zhengzhou-Xi'an Railway Passenger Dedicated Line [J].
Jiang, Ze-Zhong .
Journal of Railway Engineering Society, 2014, 31 (01) :53-58
[26]   Design and Optimization of Passenger Line for Urban Passenger Transportation Hubs Based on BIM [J].
Zhang, Rujie ;
Wang, Jianwei .
CONFERENCE PROCEEDINGS OF THE 6TH INTERNATIONAL SYMPOSIUM ON PROJECT MANAGEMENT (ISPM2018), 2018, :365-370
[27]   Study on the Evolution of Railway Hub Logistics Spatial Network under Passenger Dedicated Line Conditions [J].
Zou Yifeng ;
Liu Ting ;
Xie Ruhe .
MANAGEMENT, MANUFACTURING AND MATERIALS ENGINEERING, PTS 1 AND 2, 2012, 452-453 :858-+
[28]   Interaction analysis between night train operation and maintenance time on passenger dedicated railway line [J].
Nie, Lei ;
Hu, Bisong ;
Fu, Huiling ;
Tong, Lu .
Journal of Transportation Systems Engineering and Information Technology, 2010, 10 (05) :66-72
[29]   The Analysis about the Post-Evaluation Mechanism on Railway Passenger Dedicated Line Construction Project [J].
Ren, Xu ;
Huang, Na .
PROCEEDINGS OF 2010 INTERNATIONAL CONFERENCE ON CONSTRUCTION AND REAL ESTATE MANAGEMENT, VOLS 1-3, 2010, :605-608
[30]   Study on the obligate deformation of flexible protection system for railway passenger dedicated line paralleled the highway [J].
Railway Science and Technology Research and Development Center, China Academy of Railway Sciences, Beijing 100081, China ;
不详 .
Zhongguo Tiedao Kexue, 2007, 3 (23-26)