共 50 条
- [41] Calculation Method for Embankment Post-construction Settlement Based on Mesri Creep Model Tiedao Xuebao/Journal of the China Railway Society, 2018, 40 (09): : 111 - 118
- [42] Study on Post-Construction Settlement of Ningbo Airport Runways PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING, PTS. 1-5, 2012, 204-208 : 1794 - 1800
- [43] Control of post-construction settlement of high embankment based on settlement rate Electronic Journal of Geotechnical Engineering, 2014, 19 (Z7): : 19111 - 19120
- [44] Seismic Response of Foundation Settlement for Liquid Storage Structure in Collapsible Loess Areas APPLIED SCIENCES-BASEL, 2024, 14 (19):
- [45] Post-Construction Settlement of Expressway Embankment with FCB Treatment THEORIES AND TECHNOLOGIES FOR HIGH-SPEED TRANSPORTATION INFRASTRUCTURE, 2012, : 312 - 319
- [46] Comparative study on settlement prediction of railway subgrade on collapsible loess area APPLIED MECHANICS AND CIVIL ENGINEERING II, 2012, 188 : 49 - 53
- [47] Experimental study on construction parameters of collapsible loess foundation treated by vibrating rod compaction method Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2021, 43 : 229 - 232
- [48] Analysis of construction and post-construction settlement data caused by immersed tunnel Wei, G. (weig@zucc.edu.cn), 1600, Academia Sinica (32):
- [50] INVESTIGATION ON MULTI-TYPE-PILE COMPOSITE FOUNDATION TECHNIQUE APPLIED TO FOUNDATION TREATMENT OF COLLAPSIBLE LOESS RECENT DEVELOPMENTS OF GEOTECHNICAL ENGINEERING, 2010, : 589 - 593