Pace of F-22 testing puts USAF under fire

被引:0
作者
机构
来源
Aviation Week and Space Technology (New York) | 2000年 / 152卷 / 13期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
[41]   Additional F-22 testing planned, despite increased costs [J].
Wall, R .
AVIATION WEEK & SPACE TECHNOLOGY, 2001, 154 (14) :48-49
[42]   F-22 faces more delays; Operational testing on track [J].
Aviation Week and Space Technology (New York), 1998, 148 (09)
[43]   F-22 faces more delays; Operational testing on track [J].
Kandebo, SW .
AVIATION WEEK & SPACE TECHNOLOGY, 1998, 148 (09) :S6-S6
[44]   F-22 radar development [J].
Malas, JA .
PROCEEDINGS OF THE IEEE 1997 AEROSPACE AND ELECTRONICS CONFERENCE - NAECON 1997, VOLS 1 AND 2, 1997, :831-839
[45]   Japan, the F-22 and History [J].
不详 .
ASIA-PACIFIC JOURNAL-JAPAN FOCUS, 2007, 5 (05)
[46]   F-22 out front [J].
Air Force Mag, 8 (50)
[47]   Low-speed wind tunnel buffet testing on the F-22 [J].
Anderson, William D. ;
Patel, Suresh R. ;
Black, Christopher L. .
JOURNAL OF AIRCRAFT, 2006, 43 (04) :879-885
[48]   Who needs the F-22? [J].
Tirpak, John A. .
Air Force Magazine, 1995, 78 (04)
[49]   F-22 production delayed [J].
Aviat Week Space Technol (New York), 16 (64)
[50]   F-22 liquid cooling [J].
不详 .
AVIATION WEEK & SPACE TECHNOLOGY, 1996, 144 (09) :41-41