共 22 条
- [1] Baker K.R., An experimental study of the effectiveness of rolling schedules in production planning, Decision Science, 8, pp. 19-27, (1973)
- [2] Suwa H., A new when-To-schedule policy in online scheduling based on cumulative task delays, International Journal of Production Economics, 110, 1-2, pp. 175-186, (2007)
- [3] Sugimura N., Tanimizu Y., Iwamura K., A study on real-Time scheduling for holonic manufacturing system, CIRP Journal of Manufacturing Systems, 33, 5, pp. 467-475, (2004)
- [4] Smith S.F., Reactive scheduling systems, Intelligent Scheduling Systems, pp. 155-192, (1995)
- [5] Tanimizu Y., Sugimura N., A study on reactive scheduling based on genetic algorithm, Proc. of the 35th CIRP-ISMS, pp. 219-224, (2002)
- [6] Tanimizu Y., Sakaguchi T., Sugimura N., Reactive scheduling system for unforeseen delays of manufacturing processes, Proc. of Seventh International Pacific Conference on Manufacturing & Management, 2, pp. 714-719, (2002)
- [7] Tanimizu Y., Sakaguchi T., Harada K., Sugimura N., Genetic algorithm based reactive scheduling in multi-layered manufacturing system, Proc. of 2002 Japan-USA Symposium on Flexible Automation, 2, pp. 951-958, (2002)
- [8] Tanimizu Y., Sakaguchi T., Sugimura N., Reactive scheduling for unscheduled changes in manufacturing systems, Current Trends in Production Management, European Series in Industrial Management, 6, pp. 80-86, (2003)
- [9] Tanimizu Y., Sakaguchi T., Sugimura N., Genetic algorithm based reactive scheduling for emergent jobs, Proc. of 2004 Japan-USA Symposium on Flexible Automation, pp. 1-6, (2004)
- [10] Tanimizu Y., Sakaguchi T., Iwamura K., Sugimura N., Evolutional reactive scheduling for agile manufacturing systems, International Journal of Production Research, 44, 18-19, pp. 3727-3742, (2006)