共 50 条
[21]
A simplified approach for settlement calculation of pile groups considering pile-to-pile interaction in layered soils
[J].
Journal of Central South University of Technology,
2011, 18
:2131-2136
[22]
An efficient approach for settlement prediction of pile groups
[J].
GEOTECHNIQUE,
1999, 49 (02)
:161-179
[23]
The analysis of settlement and interal force of pile groups wind turbine foundation
[J].
Taiyangneng Xuebao,
7 (1664-1670)
[25]
Bored Pile Settlement Analysis of Pile End Grouting in Civil Engineering
[J].
ADVANCED RESEARCH ON CIVIL ENGINEERING AND MATERIAL ENGINEERING,
2012, 568
:99-+
[26]
The Calculation of Critical Pile Length for Super-long Pile Based on Settlement Control
[J].
FRONTIERS OF GREEN BUILDING, MATERIALS AND CIVIL ENGINEERING, PTS 1-8,
2011, 71-78
:4179-+
[27]
A Method for Estimating Pile Group Settlement Considering Distribution of Pile Shaft Friction (SDF) - Application for Pile Groups in Vietnam
[J].
GEOTECHNICAL ENGINEERING,
2016, 47 (01)
:69-78
[28]
Reliability analysis of settlement of pile group
[J].
Innovative Infrastructure Solutions,
2021, 6
[29]
RELIABILITY-ANALYSIS OF PILE SETTLEMENT
[J].
JOURNAL OF GEOTECHNICAL ENGINEERING-ASCE,
1990, 116 (11)
:1717-1735