A supervision approach for nuclear power construction projects at earlier stage

被引:0
作者
Wu, Yunna [1 ]
Zhang, Jinying [1 ]
Tian, Na [1 ]
Geng, Shuai [1 ]
Zhang, Yan [1 ]
机构
[1] North China Electric Power University, Beijing, China
来源
Energy Education Science and Technology Part A: Energy Science and Research | 2014年 / 32卷 / 06期
关键词
Nuclear energy - Project management - Heuristic methods - Nuclear fuels - Contractors - Quality management - Electric utilities - Quality control - Nuclear power plants;
D O I
暂无
中图分类号
学科分类号
摘要
In order to improve the project management performance of nuclear power construction projects in China, the nuclear power companies and the government are seeking a method to establish a construction management supervision system. This paper analyzed the supervision of nuclear project quality management and proposes a quality supervision mechanism. It consisted of a co-framework of the contractor / construction party quality self-control system and the construction party / government supervision system. To achieve better supervision, we proposed a quality evaluation method introducing Rough Set Theory based on the mechanism. The method applied a heuristic attribute reduction algorithm in the reduction of index attribute to elicits factors closely associated with project quality, namely, the supervision points. By using the method, the construction party of nuclear power construction projects are able to achieve effective supervision over contractors and the government can use the evaluation results to regulate the construction party’ quality management validly. © Sila Science. All Rights Reserved.
引用
收藏
页码:7631 / 7644