共 35 条
[21]
Sayadi M., Ramezanian R., Ghaffari-Nasab N., A discrete firefly meta-heuristic with local search for makespan minimization in permutation flow shop scheduling problems, International Journal of Industrial Engineering Computations, 1, 1, pp. 1-10, (2010)
[22]
Singer M., Pinedo M., A computational study of branch and bound techniques for minimizing the total weighted tardiness in job shops, IIE Transactions, 30, 2, pp. 109-118, (1998)
[23]
Tavakkoli-Moghaddam R., Khalili M., Naderi B., A hybridization of simulated annealing and electromagnetic-like mechanism for job shop problems with machine availability and sequence-dependent setup times to minimize total weighted tardiness, Soft Computing, 13, 10, pp. 995-1006, (2009)
[24]
Vahedi-Nouri B., Fattahi P., Ramezanian R., Minimizing total flow time for the non-permutation flow shop scheduling problem with learning effects and availability constraints, Journal of Manufacturing Systems, 32, 1, pp. 167-173, (2013)
[25]
Vahedi-Nouri B., Fattahi P., Rohaninejad M., Tavakkoli-Moghaddam R., Minimizing the total completion time on a single machine with the learning effect and multiple availability constraints, Applied Mathematical Modelling, 37, 5, pp. 3126-3137, (2013)
[26]
Vahedi-Nouri B., Fattahi P., Ramezanian R., Hybrid firefly-simulated annealing algorithm for the flow shop problem with learning effects and flexible maintenance activities, International Journal of Production Research, 51, 12, pp. 3501-3515, (2013)
[27]
Vahedi-Nouri B., Fattahi P., Tavakkoli-Moghaddam R., Ramezanian R., A general flow shop scheduling problem with consideration of position-based learning effect and multiple availability constraints, The International Journal of Advanced Manufacturing Technology, 73, 5-8, pp. 601-611, (2014)
[28]
Wang S., ACO-based method for single machine scheduling with sequence-dependent setup time and limited capacity warehouse, International Journal of Industrial and Systems Engineering, 16, 3, pp. 334-364, (2014)
[29]
Watanabe M., Ida K., Gen M., A genetic algorithm with modified crossover operator and search area adaptation for the job-shop scheduling problem, Computers & Industrial Engineering, 48, 4, pp. 743-752, (2005)
[30]
Wu C.J., Hamada M.S., Experiments: Planning, Analysis, and Optimization, (2011)