共 13 条
- [1] Muelaner J.E., Martin O.C., Maropoulos P.G., Achieving low cost and high quality aero structure assembly through integrated digital metrology systems, Procedia Cirp., 7, 5, pp. 688-693, (2013)
- [2] Song X., Wu Y., Ma Y., Military simulation big data: Background, state of the art, and challenges, Math. Probl. Eng., 2015, 1, pp. 1-20, (2015)
- [3] Ju Y.L., Kang H.S., Kim G.Y., Sang D.N., Concurrent material flow analysis by P3R-driven modeling and simulation in PLM, Comput. Ind., 63, 5, pp. 513-527, (2012)
- [4] Jeong K.Y., Allan D., Integrated system design, analysis and database-driven simulation model generation, 37th Annual Symp. Simulation, pp. 80-85, (2004)
- [5] Tannock J., Cao B., Farr R., Et al., Data-driven simulation of the supply-chain-Insights from the aerospace sector, Int. J. Prod. Econ., 110, 1-2, pp. 70-84, (2007)
- [6] Johansson M., Johansson B., Skoogh A., Leong S., Riddick F., Lee Y.T., Et al., A test implementation of the core manufacturing simulation data specification, Winter Simulation Conf., Wsc, 1, pp. 1673-1681, (2007)
- [7] Song X., Zhang L., Gong G., Digital product data exchange in semantic serviceoriented architecture, COMPEL., 28, 6, pp. 1560-1578, (2009)
- [8] Song X., Chai X.D., Zhang L., Modeling framework for product lifecycle information, Simul. Model. Pract. Theory, 18, 8, pp. 1080-1091, (2010)
- [9] Li J.Z., Uma J., OkJoon K., Semantic applications enabling reasoning in product assembly ontologies-Moving past modeling, J. Comput. Inf. Sci. Eng., 12, 1, (2012)
- [10] Wang H., Xiang D., Duan G., Et al., Assembly planning based on semantic modeling approach, Comput. Ind., 58, 3, pp. 227-239, (2007)