Numerical calculation for construction ventilation system of large-scale underground tunnel-chamber group of hydroelectric engineering

被引:0
|
作者
State Key Laboratory of Water Resource and Hydropower Engineering Science, Wuhan University, Wuhan 430072, China [1 ]
不详 [2 ]
不详 [3 ]
机构
来源
Shuili Fadian Xuebao | 2007年 / 2卷 / 108-113期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:108 / 113
相关论文
共 24 条
  • [1] Optimization of construction ventilation scheme for large-scale underground cavern group of Xiangjiaba hydropower station based on numerical simulation
    Li, Yan-Ling
    Yin, Qiang
    Mo, Zheng-Yu
    Tang, Cong-Zheng
    Chen, Xin
    Yang, Xing-Guo
    Sichuan Daxue Xuebao (Gongcheng Kexue Ban)/Journal of Sichuan University (Engineering Science Edition), 2010, 42 (04): : 1 - 6
  • [2] Numerical Simulation of Ventilation Performance for Large-scale Underground Cavern Group Considering Effect of Ventilation Shaft Structure
    Yimin Xia
    Xuemeng Xiao
    Yazhou Zhang
    Shuying Wang
    Laikuang Lin
    Arabian Journal for Science and Engineering, 2022, 47 : 4093 - 4104
  • [3] Numerical Simulation of Ventilation Performance for Large-scale Underground Cavern Group Considering Effect of Ventilation Shaft Structure
    Xia, Yimin
    Xiao, Xuemeng
    Zhang, Yazhou
    Wang, Shuying
    Lin, Laikuang
    ARABIAN JOURNAL FOR SCIENCE AND ENGINEERING, 2022, 47 (04) : 4093 - 4104
  • [4] Optimization Scheme for Construction Ventilation in Large-Scale Underground Oil Storage Caverns
    Zhang, Heng
    Sun, Jianchun
    Lin, Fang
    Chen, Shougen
    Yang, Jiasong
    APPLIED SCIENCES-BASEL, 2018, 8 (10):
  • [5] Numerical Simulation and Evaluation of Construction Process on Large-scale Underground Plants
    Zuo, Shuangying
    Wang, Xingjian
    2010 ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), 2010,
  • [6] Reasonable Paths of Construction Ventilation for Large-Scale Underground Cavern Groups in Winter and Summer
    Sun, Jianchun
    Zhang, Heng
    Huang, Muyan
    Chen, Qianyang
    Chen, Shougen
    SUSTAINABILITY, 2018, 10 (10)
  • [7] Analysis and evaluation system of rapid monitoring of large-scale underground cavern group during construction period in Southwest China
    Cai, Dewen
    Wang, Dikai
    Chen, Xiaopeng
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2014, 33 (11): : 2341 - 2350
  • [8] Study on dynamic stability of large-scale underground cavern group during construction period of hydropower station
    Nie, Weiping
    Shi, Chong
    MECHANICAL ENGINEERING AND MATERIALS, PTS 1-3, 2012, 152-154 : 820 - +
  • [9] Splitting failure in side walls of a large-scale underground cavern group: a numerical modelling and a field study
    Wang, Zhishen
    Li, Yong
    Zhu, Weishen
    Xue, Yiguo
    Yu, Song
    SPRINGERPLUS, 2016, 5
  • [10] Numerical Modeling and Optimizing Construction Schemes for Transition Section Complex Structure of Large Scale Underground Railway Station and Tunnel
    Cao, Ruilang
    He, Shaohui
    Gao, Delian
    ADVANCES IN CIVIL ENGINEERING II, PTS 1-4, 2013, 256-259 : 1177 - +