共 50 条
[23]
Some Complements on the Mechanical Calculation of Conductors for Overhead Electric Lines - 5.
[J].
Energia Elettrica,
1975, 52 (7-8)
:416-424
[24]
PERFORMANCE OF DISTANCE PROTECTION APPLIED TO UNDERGROUND CABLES ALONE OR MIXED WITH OVERHEAD LINES
[J].
PROCEEDINGS OF THE INSTITUTION OF ELECTRICAL ENGINEERS-LONDON,
1979, 126 (09)
:805-814
[25]
STABILITY IN SYSTEMS WITH MOVING CONTACT LINES.
[J].
Journal of Fluid Mechanics,
1986, 173
:115-130
[26]
Full-Scale Delivery of Fault Sector System for Overhead/Underground Transmission Lines
[J].
SEI Technical Review,
2022, (94)
:40-45
[27]
Calculation of Sag of Overhead Lines Using the Programmable HP 67 Pocket Calculator.
[J].
Elektrizitatswirtschaft,
1981, 80 (09)
:288-291
[28]
CALCULATION OF UNINSULATED OVERHEAD LINES WITH ACCOUNT TAKEN OF PLASTIC DEFORMATIONS AFTER MOUNTING.
[J].
Soviet power engineering,
1981, 10 (05)
:774-784
[29]
Thermal Regeneration of Steam Lines to Turbines.
[J].
Energietechnik Leipzig,
1980, 30 (05)
:181-184
[30]
380 kV POWER LINES OF BAYERNWERK AG EXEMPLIFY THE DEVELOPMENT OF OVERHEAD LINE CONSTRUCTION IN GERMANY.
[J].
1978, 45 (10)
:443-448