Multi-stage man-machine cooperated scheduling method for steelmaking & continuous casting

被引:0
|
作者
Zhao, Ning [1 ]
Li, Liang [1 ]
Du, Yan-Hua [1 ]
机构
[1] School of Mechanical Engineering, University of Science and Technology Beijing, Beijing
来源
Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS | 2014年 / 20卷 / 07期
基金
中国国家自然科学基金;
关键词
Critical path; Man machine cooperated; Neighborhood search; Scheduling; Steelmaking and continuous casting;
D O I
10.13196/j.cims.2014.07.zhaoning.1675.9.20140717
中图分类号
学科分类号
摘要
Aiming at the shortage of existing scheduling method, a new Multi-Stage Man-Machine Cooperated scheduling method (MSMMC) was presented. The scheduling model and scheduling structure of MSMMC were built, and the greedy algorithm, reversed greedy algorithm and neighborhood search algorithm were applied to optimize them. The group adjustment method was used to satisfy the constraints, thus the scheduling experience could be integrated into optimization process. A scheduling example showed that MSMMC could amplify the advantage of human experience, and the performance testing showed that MSMMC had good computational efficiency.
引用
收藏
页码:1675 / 1683
页数:8
相关论文
共 15 条
  • [1] Wang B., Li T., Zhang C., Et al., Dynamic CSP based scheduling algorithm for steelmaking & continuous casting with conticaster breakdown, Computer Integrated Manufacturing Systems, 17, 10, pp. 2185-2193, (2011)
  • [2] Pacciarelli D., Pranzo M., Production scheduling in a steelmaking-continuous casting plant, Computers and Chemical Engineering, 18, 12, pp. 2823-2835, (2004)
  • [3] Naphade K.S., Wu S.D., Storer R.H., Et al., Melt seheduling to trade off material waste and shipping Performance, Operations Research, 49, 5, pp. 629-645, (2001)
  • [4] Xuan H., Three-stage HFS scheduling problem with serial batching machines, Computer Integrated Manufacturing Systems, 18, 5, pp. 1006-1010, (2012)
  • [5] Pan Q., Wang L., Mao K., An effective artificial bee colony algorithm for a real-world hybrid flowshop problem in steelmaking process, IEEE Transactions on Automation Science and Engineering, 10, 2, pp. 307-322, (2013)
  • [6] Santos C.A., Spim J.A., Garcia A., Mathematical modeling and optimization strategies (genetic algorithm and knowledge base) applied to the continuous casting of steel, Engineering Applications of artificial Intelligence, 16, 6, pp. 511-527, (2003)
  • [7] Tang L., Wang X., An improved particle swarm optimization algorithm for the hybrid flowshop scheduling to minimize total weighted completion time in process industry, IEEE Transactions on Control Systems Technology, 18, 6, pp. 1303-1314, (2010)
  • [8] Dong H., Huang M., Improved varible neighborhood search for integrated tundish planning in steelmaking process, International Journal of Production Research, 50, 20, pp. 5747-5761, (2012)
  • [9] Chen K., Zheng Z., Gao X., Computer-aided planning and scheduling system for steelmaking-continuous casting, Journal of Iron and Steel Research International, 17, 2, pp. 29-34, (2010)
  • [10] Yu S., Chen W., Pang X., Et al., Simulation system of dynamic scheduling of steelmaking & continuous casting based on graphic edit platform, Journal of System Simulation, 21, 16, pp. 5145-5149, (2009)