Automated guided vehicle configurations in flexible manufacturing systems: A comparative study

被引:0
作者
Kumar, Ravindra [1 ]
Haleem, Abid [2 ]
Garg, Suresh K. [3 ]
Singh, Rajesh K. [3 ]
机构
[1] Mechanical and Automation Engineering Department, Guru Premsukh Memorial College of Engineering, 245,GT Karnal Road, Budhpur
[2] Mechanical Engineering Department, Jamia Millia Islamia, Jamia Nagar, Delhi
[3] Mechanical Engineering Department, Delhi Technological University, Main Bawana Road, Shahbad Daulatpur
关键词
AGV guide path; Automated guided vehicle configuration; Flexible manufacturing system; FMS; Mass customisation; Material handling system; Simulation; Taguchi method;
D O I
10.1504/IJISE.2015.071510
中图分类号
学科分类号
摘要
In the present competitive environment, manufacturing organisations have changed the trend from mass production to mass customisation. Flexible manufacturing system (FMS) has evolved as a solution to the requirement of modern manufacturing industries. Automated guided vehicle (AGV) system is the most widely used material handling system in FMS which enhances the flexibility in material transfer between the workstations (WSs). The pattern of AGV guide path layout also called as AGV configuration has become the main issue in the AGV system. This paper compares the three commonly used AGV configurations, i.e., single loop, tandem, and tandem loop in terms of AGV load/unload time, machine failure, processing time distribution and AGV speed. Simulation method is used to perform the study while Taguchi method is used for statistical analysis of results. It has been concluded that no single AGV configuration perform better in all the manufacturing environments. Copyright © 2015 Inderscience Enterprises Ltd.
引用
收藏
页码:207 / 226
页数:19
相关论文
共 52 条
[1]  
Abdelmaguid T.F., Nassef O.N., Kamal B.A., Hassan M.F., A hybrid GA/heuristic approach to the simultaneous scheduling of machines and automated guided vehicles, International Journal of Production Research, 42, 2, pp. 267-281, (2004)
[2]  
Aized T., Modelling and performance maximization of an integrated automated guided vehicle system using colored petri net and response surface methods, Computers and Industrial Engineering, 57, 3, pp. 822-831, (2009)
[3]  
Bozer Y.A., Rim S.C., A branch and bound method for solving the bi-directional circular layout problem, Applied Mathematical Modeling, 20, 5, pp. 342-351, (1996)
[4]  
Bozer Y.A., Srinivasan M.M., Tandem configuration for AGV systems offers flexibility and simplicity, Industrial Engineering, 21, 2, pp. 23-27, (1989)
[5]  
Bozer Y.A., Srinivasan M.M., Tandem configurations for automated guided vehicle systems and the analysis of single vehicle loops, IIE Transactions, 23, 1, pp. 72-82, (1991)
[6]  
Caumond A., Lacomme P., Moukrim A., Tchernev N., An MILP for scheduling problems in an FMS with one vehicle, European Journal of Operational Research, 199, 3, pp. 706-722, (2009)
[7]  
Chan F.T.S., Swarnkar R., Ant colony optimization approach to a fuzzy goal programming model for a machine tool selection and operation allocation problem in an FMS, Robotics and Computer Integrated Manufacturing, 22, 4, pp. 353-362, (2006)
[8]  
Chen J.H., Ho S.Y., A novel approach to production planning of flexible manufacturing systems using an efficient multi-objective genetic algorithm, International Journal of Machine Tool Manufacturing, 45, 7-8, pp. 949-957, (2005)
[9]  
Choi H.G., Kwon H.J., Lee J., Traditional and tandem AGV system layouts: A simulation study, Simulation, 63, 2, pp. 85-93, (1994)
[10]  
Dahel N.E., Design of cellular manufacturing systems in tandem configuration, International Journal of Production Research, 33, 2, pp. 2079-2095, (1995)