共 52 条
[1]
Abdelmaguid T.F., Nassef O.N., Kamal B.A., Hassan M.F., A hybrid GA/heuristic approach to the simultaneous scheduling of machines and automated guided vehicles, International Journal of Production Research, 42, 2, pp. 267-281, (2004)
[2]
Aized T., Modelling and performance maximization of an integrated automated guided vehicle system using colored petri net and response surface methods, Computers and Industrial Engineering, 57, 3, pp. 822-831, (2009)
[3]
Bozer Y.A., Rim S.C., A branch and bound method for solving the bi-directional circular layout problem, Applied Mathematical Modeling, 20, 5, pp. 342-351, (1996)
[4]
Bozer Y.A., Srinivasan M.M., Tandem configuration for AGV systems offers flexibility and simplicity, Industrial Engineering, 21, 2, pp. 23-27, (1989)
[5]
Bozer Y.A., Srinivasan M.M., Tandem configurations for automated guided vehicle systems and the analysis of single vehicle loops, IIE Transactions, 23, 1, pp. 72-82, (1991)
[6]
Caumond A., Lacomme P., Moukrim A., Tchernev N., An MILP for scheduling problems in an FMS with one vehicle, European Journal of Operational Research, 199, 3, pp. 706-722, (2009)
[7]
Chan F.T.S., Swarnkar R., Ant colony optimization approach to a fuzzy goal programming model for a machine tool selection and operation allocation problem in an FMS, Robotics and Computer Integrated Manufacturing, 22, 4, pp. 353-362, (2006)
[8]
Chen J.H., Ho S.Y., A novel approach to production planning of flexible manufacturing systems using an efficient multi-objective genetic algorithm, International Journal of Machine Tool Manufacturing, 45, 7-8, pp. 949-957, (2005)
[9]
Choi H.G., Kwon H.J., Lee J., Traditional and tandem AGV system layouts: A simulation study, Simulation, 63, 2, pp. 85-93, (1994)
[10]
Dahel N.E., Design of cellular manufacturing systems in tandem configuration, International Journal of Production Research, 33, 2, pp. 2079-2095, (1995)