共 30 条
- [1] GUNGOR A, GUPTA S M, POCHAMPALLY K, Et al., Complications in disassembly line balancing, Proceedings of SPIE International Conference on Environmentally Conscious Manufacturing, pp. 289-298, (2001)
- [2] AVIKAL S, JAIN R, YADAV H, Et al., A new heuristic for disassembly line balancing problems with AND/OR precedence relation, Proceedings of the 2nd International Conference on Soft Computing for Problem Solving, pp. 519-525, (2014)
- [3] KOC A, SABUNCUOGLU I, EREL E., Two exact formulations for disassembly line balancing problems with task precedence diagram construction using an AND/OR graph, IIE Transactions, 41, 10, pp. 866-881, (2009)
- [4] REN Y, YU D, ZHANG C, Et al., An improved gravitational search algorithm for profit-oriented partial disassembly line balancing problem, International Journal of Production Research, 55, 24, pp. 7302-7316, (2017)
- [5] DING Li-ping, TAN Jian-rong, FENG Yi-xiong, Et al., Multi-objective optimization for disassembly line balancing based on Pareto ant colony algorithm, Computer Integrated Manufacturing Systems, 15, 7, pp. 1406-1413, (2009)
- [6] GUO Lei, ZHANG Xiu-fen, Remanufacturing parallel disassembly sequence planning method driven by multiple failures, Journal of Zhejiang University: Engineering Science, 54, 11, pp. 2233-2246, (2020)
- [7] XU Jin, ZHANG Shu-you, FEI Shao-mei, Product remanufacture disassembly planning based on adaptive particle swarm optimization algorithm, Journal of Zhejiang University: Engineering Science, 45, 10, pp. 1746-1752, (2011)
- [8] ZHU Zhuo-yue, XU Zhi-gang, SHEN Wei-dong, Et al., Selective-disassembly sequence planning based on genetic-bat algorithm, Journal of Zhejiang University: Engineering Science, 52, 11, pp. 2120-2127, (2018)
- [9] LU Jian-xia, ZHAI Wen-qian, LI Jia-feng, Et al., Multi-constrained vehicle routing optimization based on improved hybrid shuffled frog leaping algorithm, Journal of Zhejiang University: Engineering Science, 55, 2, pp. 259-270, (2021)
- [10] WANG Yun, FENG Yi-xiong, TAN Jian-rong, Et al., Multi-objective optimization method of flexible job-shop lot-splitting scheduling, Journal of Zhejiang University: Engineering Science, 45, 4, pp. 719-726, (2011)