共 34 条
[1]
Agnetis A., Detti P., Pranzo M., Sodhi M.S., Sequencing unreliable jobs on parallel machines, Journal of Scheduling, 12, 1, pp. 45-54, (2009)
[2]
Al-Hinai N., ElMekkawy T.Y., An efficient hybridized genetic algorithm archi-tecture for the flexible job-shop scheduling problem, Flexible Services and Manufacturing Journal, 23, 1, pp. 64-85, (2011)
[3]
Ali M., Impact of routing and pallet flexibility on flexible manufacturing system, Global Journal of Flexible Systems Management, 13, 3, pp. 141-149, (2012)
[4]
Ali M., Wadhwa S., Performance analysis of partial flexible manufacturing system, Global Journal of Flexible System Management, 6, 1, pp. 9-19, (2005)
[5]
Ali M., Wadhwa S., The effect of routing flexibility on a flexible system of integrated manufacturing, International Journal of Production Research, 48, 19, pp. 5691-5709, (2010)
[6]
Benjaafar S., Ramakrishnan R., Modelling, measurement and evaluation of sequencing flexibility in manufacturing system, International Journal of Production Research, 34, 5, pp. 1195-1220, (1996)
[7]
Browne J., Dubois D., Rathmill K., Sethi S.P., Stecke K.E., Classification of flexible manufacturing systems, FMS Magazine, 2, 2, pp. 114-117, (1984)
[8]
Chan F.T.S., Impact of operation flexibility and dispatching rules on the performance of a flexible manufacturing system, International Journal of Advanced Manufacturing Technology, 24, 5-6, pp. 447-459, (2004)
[9]
Choi S.-H., James S.L., A sequencing algorithm for makespan minimization in FMS, Journal of Manufacturing Technology Management, 15, 3, pp. 291-297, (2004)
[10]
El-Khalil R., Simulation and modelling: Operating and managing a new axle manufacturing system, International Journal of Industrial and Systems Engineering, 13, 2, pp. 219-232, (2013)