摘要
Mott MacDonald Bentley Ltd (MMB) has carried out modification works to an impounding reservoir in Yorkshire, to enable the overflow system to safely pass the probable maximum flood (PMF) and maintain compliance with the Reservoirs Act 1975. The works, included lining the existing spillway and stilling basin with reinforced concrete. This logistically complex £1·8 million scheme is a key example of MMB’s use of off-site construction and application of innovation to overcome significant challenges that reservoir sites can present. The reservoir has a very steep spillway, which presented MMB with a limited number of options in terms of accessing the spillway and safely constructing the proposed, ensuring a high-quality finished product. With a well-developed track record of precast concrete (PCC) construction on reservoir projects, the MMB team were inspired to push the boundaries of current design and construction methodologies. They developed a PCC ‘U-section’ product to line the spillway, installed via a unique rail and winch system. This paper describes the design and construction of the U-sections and associated installation system, including testing of the joint system to prove hydraulic performance. This design resulted in increased speed of construction, reduced costs and zero injuries on site. © ICE Publishing.
引用
收藏
页码:32 / 40
页数:8
相关论文
共 50 条
  • [41] Spillway capacity upgrade at Malarce dam: Design of an additional Piano Key Weir spillway
    Pinchard, T.
    Boutet, J. -M.
    Cicero, G. M.
    LABYRINTH AND PIANO KEY WEIRS - PKW 2011, 2011, : 233 - 240
  • [42] Construction and Application of Enterprise Knowledge Base for Product Innovation Design
    Zhang, Lulu
    Tan, Runhua
    Peng, Qingjin
    Shao, Peng
    Dong, Yafan
    Wang, Kang
    APPLIED SCIENCES-BASEL, 2022, 12 (13):
  • [43] Knowledge across cultures in the construction industry: sustainability, innovation and design
    Demaid, A
    Quintas, P
    TECHNOVATION, 2006, 26 (5-6) : 603 - 610
  • [44] Service innovation through linking design, construction and asset management
    Smyth, Hedley
    Razmdoost, Kamran
    Mills, Grant R. W.
    BUILT ENVIRONMENT PROJECT AND ASSET MANAGEMENT, 2019, 9 (01) : 80 - 86
  • [45] Dam safety policy for spillway design floods
    Dubler, JR
    Grigg, NS
    JOURNAL OF PROFESSIONAL ISSUES IN ENGINEERING EDUCATION AND PRACTICE, 1996, 122 (04) : 163 - 169
  • [46] Design and hydraulic modelling of a fuse plug spillway
    Schmocker, L.
    Ruehli, E.
    Weitbrecht, V.
    Boes, R. M.
    Mayor, P. A.
    Springman, S. M.
    DAMS AND RESERVOIRS UNDER CHANGING CHALLENGES, 2011, : 669 - 676
  • [47] Design of anchored slabs in spillway stilling basins
    Fiorotto, V
    Salandin, P
    JOURNAL OF HYDRAULIC ENGINEERING-ASCE, 2000, 126 (07): : 502 - 512
  • [48] GEOLOGICAL FACTORS IN SPILLWAY TERMINAL STRUCTURE DESIGN
    WOODWARD, RC
    ENGINEERING GEOLOGY, 1985, 22 (01) : 61 - 70
  • [49] Hydraulic design of Nakasujigawa dam stepped spillway
    Hakoishi, N
    Sumi, T
    HYDRAULICS OF STEPPED SPILLWAYS, 2000, : 27 - 34
  • [50] DESIGN OF SPILLWAY GATES OF IWAYA DAM.
    Toda, Goro
    Makita, Takehito
    Doboku Gakkai-shi/Journal of the Japan Society of Civil Engineers, 1977, 62 (02): : 17 - 24