共 50 条
- [42] QUALITY ASSURANCE PROGRAMMES FOR OFFSHORE PRODUCTION PLATFORMS. European Petroleum Conference, 1980, 1 : 543 - 549
- [43] A Case on Innovative Method of Ash-Dyke Raising Beyond Ultimate Height Lecture Notes in Civil Engineering, 2024, 491 : 319 - 334
- [44] Possibilities of Raising the Deposition Rate in the Process of Electric Arc Build-up. Izvestia vyssih ucebnyh zavedenij. Masinostroenie, 1982, (09): : 123 - 127
- [45] MASS MEMORIES RAISING SPEED, DROPPING COST AND STORING BILLIONS OF BYTES. Electronic Design, 1975, 23 (22): : 46 - 50
- [46] Euler Analysis of a Machine for Raising Waters Proposed by Mr. de Mour International Journal of Fluid Machinery and Systems, 2022, 15 (01): : 109 - 120
- [47] SELF-RAISING FORM SYSTEM PACES RECORD TOWER POURS. Construction Methods and Equipment, 1976, 58 (04): : 76 - 77
- [48] OPTIMIZATION OF REDUCTION SCHEDULES WITH AIM OF RAISING TEMPERATURE OF THIN SHEET AT END OF ROLLING STEEL IN THE USSR, 1974, 4 (05): : 391 - 393
- [49] COMPARISON OF SPECTRUM AND TIME HISTORY TECHNIQUES IN SEISMIC DESIGN OF PLATFORMS JOURNAL OF PETROLEUM TECHNOLOGY, 1981, 33 (03): : 437 - 445
- [50] Oil Rig Platforms in the Sea and Other Offshore Risks. Maschinenschaden, 1976, 49 (05): : 193 - 203